My WebLink
|
Help
|
About
|
Sign Out
CCMIN052198
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
1990-1999
>
1998
>
CCMIN052198
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 10:53:27 AM
Creation date
10/29/1998 5:28:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
5/21/1998
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. McKrank said no. <br /> <br /> Ms. Michelotti asked again what would happen if the ramp metering was turned on and <br /> the traffic was backing up all over Pleasanton. <br /> <br /> Mr. McKrank said the idea is not to transfer the traffic from the freeway to the City <br /> streets. <br /> <br /> Mayor Tarver said this is a workshop and a decision would be made on this at a later <br />date. He wanted Caltrans to know his personal opinion is he would lilac an agreement with <br />Caltrans as to who is in control of the meters before he would ask for them to be turned on. <br />He said a corridor plan with CMA where all the cities were in agreement on how it was going <br />to work is different from this situation with Pleasanton. He said staff will work with the City <br />of Dublin and Caltrans to come up with an agreement on a pilot program. He said if this is not <br />what Caltrans envisioned, then perhaps it should be put back on the agenda to see if there is <br />interest in doing something without an agreement. <br /> <br /> Mr. McKrank said Caltrans is against agreements with individual cities. BUt Caltrans <br />does not have a problem with a corridor agreement through the CMA. <br /> <br /> Ms. Ayala said it does not have to be done like the other corridor agreement. <br /> <br /> Mr. McKrank said correct. <br /> <br /> Mayor Tarver understood that CMA would allow the City of Pleasanton and City of <br />Dublin decide what went into the agreement. The only difference is the agreement is going <br />through CMA rather than individual cities. <br /> <br /> Mr. Brown asked if the sensors on the freeway worked in coordination with the on-ramps <br />to meter the cars entering the. freeway. <br /> <br /> Mr. McKrank said yes. <br /> <br /> Mr. Brown asked if the freeway slows down to five miles per hour does the ramp <br />metering shut down. <br /> <br /> Mr. McKranl~ said it would depend upon the policy that is developed. <br /> <br /> Mr. Brown asked if there was a minimum ramp metering requirement. <br /> <br /> Mr. McKranl~ said yes. <br /> <br /> Mr. Brown asl~ed how the numbers were arrived at. <br /> <br />Pleasanton City Council 18 05/21/98 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.