My WebLink
|
Help
|
About
|
Sign Out
RES 88286
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2012 12:29:21 PM
Creation date
12/3/1999 12:01:03 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/21/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Project site, have mitigated or will mitigate water <br />services impacts of the Project to a level of insignificance. <br /> <br /> I. Public Services And Utilities-W~tSwat~r. <br /> <br /> 1. Facts. <br /> <br /> Wastewater from the Project site would receive primary <br />and secondary treatment from the Dublin-San Ramon Services <br />District, and the DEIR indicates at page 65 that adequate <br />capacity is available for treatment and disposal of wastewater <br />from proposed development of the Project site. The DEIR <br />further indicates that development of the Project site with the <br />proposed low density residential use would generate wastewater <br />flows of approximately 108,800 gallons per day, requiring sewer <br />connections to two adjacent sewers located along Interstate 80 <br />and along Bernal Avenue. <br /> <br /> The Project does not contain any mitigation measures <br />with respect to wastewater, and the DEIR recommends on page 65 <br />that one additional mitigation measure be incorporated into the <br />Project. This mitigation measure, listed as no. 1 on page 65, <br />calls for policies in future development plans to encourage low <br />flow fixtures. <br /> <br /> Neither the DEIR nor the Final EIR states that the <br />Project's impacts related to wastewater constitute a <br />significant adverse impact of the Project. The DEIR's list on <br />page 89 of significant unavoidable adverse impacts of the <br />Project does not include wastewater impacts. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.