My WebLink
|
Help
|
About
|
Sign Out
RES 88286
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2012 12:29:21 PM
Creation date
12/3/1999 12:01:03 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/21/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
which would operate at a level of service 'E' during the <br />afternoon peak hour, as summarized on page 54 of the DEIR. <br /> <br /> The Project incorporates 12 mitigation measures which <br />are described on pages 56-57 of the DEIR, with certain <br />revisions to mitigation measures no. 9 and 10 contained on <br />page 5 of the final DEIR. These mitigation measures include <br />reservation of land for right-of-ways, proposals for the <br />configuration of certain intersections, public transit stops, <br />bike ways and pedestrian paths, and other measures which will <br />be more specifically determined during the PUD development <br />process. <br /> <br /> In addition, the DEIR proposes eight additional <br />mitigation measures numbered 13 through 20, and appearing on <br />page 57, and the Final EIR proposes one additional mitigation <br />measured numbered 21 on page 8. These additional recommended <br />mitigation measures are as follows: <br /> <br /> Measure 13: A southbound left-turn lane and a <br />northbound left-turn lane to be added to Foothill Road at its <br />intersection with Bernal Avenue; <br /> <br /> Measure 14: A traffic signal to be provided at the <br />intersection of Foothill Road and Bernal Avenue; <br /> <br />Measure 15: The Project developer to contribute to <br />the reconstruction of the Bernal Avenue bridge to four lanes; <br /> <br /> Measure 16: Double left-turn lanes to be added to the <br />westbound approach of the 1-680 southbound ramps. Double <br />right-turn lanes to be added to the northern approach, and <br /> <br /> 13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.