Laserfiche WebLink
EXHIBIT A <br /> <br /> MRBISSELL & <br /> KARN, INC. <br /> 4637 Chabot Dr., Suite 204 <br /> Pleasanton, CA 94566 <br /> (415) 463-0660 <br /> <br />May 5, 1988 Job #8704139,40 <br /> <br />Mr. Gary A. Leach <br />Assistant Director of Public Works <br />City of Pleasanton <br />200 Old Sernal Avenue <br />Pleasanton, CA 94566 <br /> <br />Subject: Engineering Services Proposal for Design of the Replacement for <br /> the Foothill #1 Booster Pump Station for Ultimate Capacity <br /> <br />Dear Mr. Leach: <br /> <br />As you requested, we are submitting this proposal for the additional design <br />services required for a pump station to replace the Foothill # 1 Booster <br />Pum~ Station with one sized for ultimate capacity in the 770 Zone. This <br />work will supplement the work we are now doing to design a temporary <br />relocated station sized only for existing demands. <br /> <br />To review the status of the project at this time, our original contract, <br />dated October 6, 1987, was amended February 16, 1988 to include (among other <br />things) design for relocation of the Foothill # 1 Booster Station to a <br />temporary station with adequate capacity for existing development. The <br />contract amendment included $7,700 for this work. The plan for a temporary <br />station was based on the expectation that when Golden Eagle Farms was <br />developed a new, permanent pump station would be constructed to replace the <br />Foothill #1 Booster Station. At this time it appears that Golden Eagle <br />Farms will develop sooner than anticipated in January - February and that it <br />will be desirable to skip the step of building a temporary station and <br />proceed directly to design and construction of the permanent pump station. <br /> <br />It is our understanding that the City has reached an agreement with the <br />developer of Golden Eagle Farms that the best approach to providing water <br />service to that project would be to include the necessary capacity in this <br />pump station, and to provide additional facilities on-site as may be <br />required. Therefore, the City has requested that our work to design a <br />relocated pump station, a part of the work required for implementation of <br />the Foothill Pressure Zone, be expanded such that the pump station be <br />designed for the ultimate development projected for the 770 Zone. <br /> <br />The following scope of work covers all tasks necessary to the planning and <br />design of the proposed pump station. The section presenting the estimated <br />fee likewise includes the fee for all tasks. Our request for additional <br />fees on the project will be in the amount of the fee estimated for design of <br />the permanent pump station, less the $7,700 already authorized. <br /> <br />WDP.8.27 <br /> <br /> <br />