Laserfiche WebLink
ARTICLE III--The statement of prevailing wages appearing in the <br />Equipment Rental Rates and General Prevailing Wage Rates is <br />hereby specifically referred to and by this reference is made a <br />part of this contract. It is further expressly agreed by and <br />between the parties hereto that should there be any conflict <br />between the terms of this instrument and the bid or proposal of <br />said Contractor, then this instrument shall control and nothing <br />herein shall be considered as an acceptance of said terms of said <br />proposal conflicting herewith. <br /> <br />ARTICLE IV--By signature hereunder, as Contractor, I certify that <br />I am aware of the provisions of Section 3700 of the Labor Code <br />which require every employer to be insured against liability for <br />worker's compensation or to undertake self-insurance in <br />accordance with the provisions of that code, and I will comply <br />with such provisions before commencing the performance of the <br />work of this contract. <br /> <br />ARTICLE V--The improvement contemplated in the performance of <br />this contract is an improvement over which the City of Pleasanton <br />shall exercise general supervision. The City of Pleasanton, <br />therefore, shall have the right to assume full and direct control <br />over this contract at its sole discretion. <br /> <br />ARTICLE VI--And the said Contractor agrees to receive and accept <br />the following prices as full compensation for furnishing all <br />materials and for doing all the work contemplated and embraced in <br />this agreement; also for all loss or damage, arising out of the <br />nature of the work aforesaid, or for the action of the elements, <br />or from any unforeseen difficulties or obstructions which may <br />arise or be encountered in the prosecution of the work until its <br />acceptance by the Department of Public Works, and for all risks <br />of every description connected with the work; also for all <br />expenses incurred by or in consequence of the suspension or <br />discontinuance of work and for well and faithfully completing the <br />work, and the whole thereof, in the manner and according to the <br />plans and specifications, and the requirements of the Engineer <br />under them to wit: <br /> <br /> <br />