My WebLink
|
Help
|
About
|
Sign Out
RES 88438
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88438
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2012 3:53:31 PM
Creation date
12/1/1999 11:35:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/6/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. The haul route for construction materials shall utilize the <br /> 1-580 -- Foothill Road -- Canyon Way route. Construction <br /> traffic using Stoneridge Drive shall be minimized to the <br /> maximum extent feasible, and shall then only be used with the <br /> approval of the City Engineer. <br /> <br />8. Sidewalks connecting the on-site sidewalks to Stoneridge Mall <br /> Road shall be added at such time that the City Engineer deems <br /> such sidewalk(s) necessary to accommodate pedestrian traffic. <br /> Sidewalks shall be located to intersect Stoneridge Mall Road <br /> at appropriate locations for crossing and shall be designed <br /> on-site to minimize driveway crossings. <br /> <br />9. The project shall pay prior to receipt of a building permit <br /> its pro rata share of each of these improvements: <br /> <br /> a. Widening Canyon Way and reconfiguring the westbound <br /> movement to allow 3 right turn movements and one <br /> combined thru-left turn movement; <br /> <br /> b. Foothill Road between Deodar Way and Stoneridge Drive <br /> shall be restriped as a 6-lane thoroughfare; <br /> <br /> c. Signalizing Laurel Creek - Foothill Road intersection. <br /> <br /> The pro-rata share shall be determined based on the <br /> percentage of project traffic using these intersections <br /> compared to all new traffic using these intersections, with <br /> "new traffic" meaning the projected traffic from all <br /> unapproved projects in the Stoneridge area and all previously <br /> approved projects conditioned to participate in these <br /> improvements. The final determination of the project's pro <br /> rata share shall be made by the City Engineer, based on his <br /> estimate of percent share and estimated improvement cost. <br /> <br />10. The developer shall allow the parking lot opposite the <br /> planned BART station site to be modified, at the expense of <br /> others, to minimize conflicting traffic movements at the time <br /> the BART station and/or parking lot is constructed. Any <br /> modification shall be subject to the developer/owners review <br /> and approval, so long as that approval is not unreasonably <br /> withheld. <br /> <br />11. In the event the City Engineer determines that manual traffic <br /> control is required at the Canyon Way - Stoneridge Mall Road <br /> intersection due to traffic volumes beyond the capacity of <br /> the three-way stop controlled intersection, the developer <br /> shall hire, on an as-needed basis, traffic control personnel <br /> to relieve potential congestion at this intersection. <br /> <br />12. That upon completion of the project, all construction <br /> trailers, materials, temporary fencing, etc. shall be removed <br /> from the site unless otherwise authorized by the Planning <br /> Director. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.