My WebLink
|
Help
|
About
|
Sign Out
PC-2007-33, PUD-65, KAVAYIOTIDIS
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2007
>
PC-2007-33, PUD-65, KAVAYIOTIDIS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:45 AM
Creation date
8/30/2007 1:23:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/27/2007
DESTRUCT DATE
15 Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
review and approval by the Planning Director prior to issuance of building permits <br />for the project. <br /> <br />TM <br />58. The proposed LEED Green Building Checklist shall be shown on one of the <br />first two pages of the plans submitted for the issuance of a building permit. The <br />sheet number(s) where each checklist item is addressed in the plan set shall be <br />noted on the checklist. All proposed green building measures shall be shown <br />throughout the plan set, as appropriate, as determined by the Planning Director <br />and the Chief Building Official. <br /> <br />59. The Building and Safety Division may require special plan check or inspections <br />for the green building measures proposed. If required, the applicant shall provide <br />verification to the Planning Department clearly stating that the Building and <br />Safety Division approved all applicable requirements relating to green building <br />measures. Said verification shall be provided prior to occupancy. <br /> <br />60. The applicant shall implement the following measures with the construction of the <br />office building covered by this approval so that a roof-mounted photovoltaic <br />system can be installed in the future: <br /> <br />a. Install electrical conduit and pull string from the roof/attic areas to the <br />building’s main electrical panel; <br /> <br />b. Engineer the roof trusses to handle an additional load as determined <br />by a structural engineer to accommodate the additional weight of a <br />typical photovoltaic system beyond that anticipated for roofing; and <br /> <br />c. Provide an area near the electrical panel for the “inverter” required to <br />convert the direct current output from the photovoltaic panels to <br />alternating current. <br /> <br /> These measures shall be indicated on the building permit plan sets. <br /> <br />BUILDING <br /> <br /> <br />61. The building shall meet the applicable Title 24 state energy requirements. <br /> <br />62. All building and/or structural plans must comply with all codes and ordinances in <br />effect before the Building and Safety Division will issue permits. <br /> <br />63. The applicant shall submit a building survey and/or record of survey and a site <br />development plan in accordance with the provisions of Chapter 18.68 of the <br />Municipal Code of the City of Pleasanton. These plans shall be approved by the <br />Chief Building Official prior to the issuance of a building permit. The site <br />development plan shall include all required information to design and construct <br />site, grading, paving, drainage, and utilities. Specific items to be indicated on the <br /> 10 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.