My WebLink
|
Help
|
About
|
Sign Out
PC-2007-33, PUD-65, KAVAYIOTIDIS
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2007
>
PC-2007-33, PUD-65, KAVAYIOTIDIS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:45 AM
Creation date
8/30/2007 1:23:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/27/2007
DESTRUCT DATE
15 Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
shall campers, trailers, motor homes, or any other vehicle be used as living or <br />sleeping quarters on the construction site. All such vehicles shall be removed <br />from the site at the end of each workday. <br /> <br />43. All excess soil from the site shall be off-hauled from the site and disposed of in a <br />lawful manner. No stockpiling of dirt on this site shall occur without specific <br />review and approval by the Planning Department. <br /> <br />44. Dust and mud shall be contained within the boundaries of the property during <br />times of construction. The project developer shall submit a dust control plan or <br />procedure as part of the building permit plans. <br /> <br />45. The project developer shall submit a waste generation disposal and diversion <br />plan to the Building and Safety Division prior to issuance of building or demolition <br />permits. The plan shall include the estimated composition and quantities of <br />waste to be generated and how the project developer shall recycle at least fifty <br />percent (50%) of the job site construction and demolition waste. Proof of <br />compliance shall be provided to the Chief Building Official prior to the issuance of <br />final occupancy. During demolition and construction, the project developer shall <br />mark all trash disposal bins "trash materials only" and all recycling bins "recycling <br />materials only". The project developer shall contact Pleasanton Garbage Service <br />for all waste disposal. Only that portion of trash and recycling waste refused by <br />Pleasanton Garbage Service shall be disposed of or diverted by another <br />trash/recycling company. <br /> <br />46. The height of the building shall be surveyed and verified as being in conformance <br />to the approved building height as shown on Exhibit "A" or as otherwise <br />conditioned. Said verification is the project developer's responsibility, shall be <br />performed by a licensed land surveyor or civil engineer, and shall be completed <br />and provided to the Planning Department before the first framing or structural <br />inspection by the Building and Safety Division. <br /> <br />47. The applicant shall submit a pad elevation certification prepared by a licensed <br />land surveyor or registered civil engineer to the Chief Building Official and <br />Planning Director, certifying that the pad elevations and building location <br />(setbacks) are pursuant to the approved plans, prior to receiving a foundation <br />inspection for the structure. <br /> <br />48. Final inspection by the Planning Department is required prior to occupancy. <br /> <br />49. If archeological materials are uncovered during grading, trenching, or other on- <br />site excavation, all work on site shall be stopped and the City immediately <br />notified. The county coroner and the Native American Heritage Commission <br />shall also be notified and procedures followed as required in Appendix K of the <br />California Environmental Quality Act. A similar note shall appear on the <br />improvement plans. <br /> 8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.