My WebLink
|
Help
|
About
|
Sign Out
PC-2007-31, PDR-563, STANLEY CENTER
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2007
>
PC-2007-31, PDR-563, STANLEY CENTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:45 AM
Creation date
8/30/2007 1:20:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/27/2007
DESTRUCT DATE
15 Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Safety Division approved all applicable requirements relating to green building <br />measures. Said verification shall be provided prior to occupancy. <br /> <br />22. The applicant shall implement the following measures with the construction of the <br />structure covered by this approval so that a roof-mounted photovoltaic system <br />can be installed in the future: <br /> <br />a. Install electrical conduit and pull string from the roof/attic areas to the <br />building’s main electrical panels; <br /> <br />b. Engineer the roof trusses to handle an additional load as determined by a <br />structural engineer to accommodate the additional weight of a prototypical <br />photovoltaic system beyond that anticipated for roofing; and <br /> <br />c. Provide an area near the electrical panel for the “inverter” required to convert <br />the direct current output from the photovoltaic panels to alternating current. <br /> <br />These measures shall be indicated on the building permit plan sets. <br /> <br />BUILDING AND SAFETY DIVISION <br /> <br />23. Obtain a building permit from the Building and Safety Division and any other <br />applicable City permits for the project prior to the commencement of any <br />construction. <br /> <br />24. The project developer shall effectively screen from view all ducts, meters, air <br />conditioning equipment, and any other mechanical equipment, whether on the <br />structure, on the ground, or on the roof, with materials architecturally compatible <br />with the main structure. Screening details shall be shown on the plans submitted <br />for issuance of building permits, the adequacy of which shall be determined by <br />the Planning Director. All required screening shall be provided prior to <br />occupancy. <br /> <br />25. All mechanical equipment shall be constructed and operated in such a manner <br />that noise emanating from it will not be perceptible beyond the property plane. <br /> <br />26. The location of any pad-mounted transformers and/or building electrical service <br />panel shall be subject to approval by the Planning Director prior to issuance of <br />permits by the Building and Safety Division. Such transformers and/or building <br />electrical service panel shall be screened by landscaping or contained within an <br />enclosure matching the building and with corrugated metal gates. All <br />transformers and/or building electrical service panel shall be shown on the plans <br />submitted for issuance of building permits. The project developer shall attempt to <br />locate transformers and/or building electrical service panel at the rear of the site. <br /> <br />5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.