Laserfiche WebLink
Timeframe for Construction: <br />Project development and competition selection: six to twelve months <br />Design and fabrication: six months <br />Plan check review and approvals, site preparation and installation:three to six months <br />Site requirements/constraints: <br />• compatible with and amenable to the mixed-use nature of the neighborhood <br />• gross footprint of approximately 35 square feet <br />• may require site preparation if installed permanently <br />• adjacent to public right of way; near the 100% location of the market, but safely distant from traffic at <br />other times of the week <br />• storage location required if it is portable <br />Potential Co-sponsors, Partners, Collaborators: <br />Pacific Coast Farmers' Market Association, Pleasanton Downtown Association, local non-profits and <br />school groups <br />29 <br />