My WebLink
|
Help
|
About
|
Sign Out
RES 88549
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88549
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2012 2:54:00 PM
Creation date
11/30/1999 11:30:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/6/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. 2.5 Meet with agency representatives to review 2. d and ,adjust <br /> system data as required to obtain acceptable fit between <br /> modeled results and recorded operational data. <br /> <br />Task 1.3 -Develop Near-Term and Long-Term Pleasanton/Zone 7/DSRSD-East <br /> Joint Use System Model for Current Design <br /> <br /> 1.3.1 Input data describing projected near-term future condition for <br /> two alternate DSRSD system configurations. <br /> <br /> 1.3.2 Perform model runs, including 24-hour simulations for average <br /> and maximum days. <br /> <br /> 1.3.3 Repeat 1.3.1 and 1.3.2 for long-term future condition. <br /> 1.3.4 Evaluate effectiveness of joint utilization for current design. <br /> <br /> 1.3.5 Review results with Pleasanton and DSRSD representatives and <br /> decide further study of alternative joint use designs. <br /> <br />Task 1.4 Develop Joint Usage Configuration for Reservoir <br /> <br /> 1.4.1 Using results of 1.3.5, adjust the size, location, and eleva- <br /> tion of Tassajara Reservoir, Transmission Main and control <br /> valves as necessary, and perform additional model runs for <br /> joint use configuration. <br /> <br /> 1.4.2 Allocate capacities of reservoir, transmission, and control <br /> valves between Pleasanton and DSRSD. <br /> <br /> 1.4.3 Review results with Pleasanton and DSRSD representatives. <br />Task 1.5 Prepare Report <br /> <br /> Summarize conduct and results of the study with suitable maps <br /> and diagrams, including model printouts as a supplement. <br /> <br />Task 1.6 Furnish Model <br /> <br /> Provide City with copies of Data Input files and Output Files <br /> desired on IBM PC format diskettes. <br /> <br />PHASE 2 - PRELIMIMARY DESIGN <br /> <br />Task 2.1 Determine Design Criteria <br /> 2. i. 1 Obtain and review available reports, such as: <br /> <br /> o Tassajara Reservoir Site Selection Study <br /> o Pleasanton Water Master Plan <br /> o Negative Declaration for Water Assessment District <br /> o Pleasanton City Design Standards <br /> <br /> -2- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.