Laserfiche WebLink
EXI:I.I~ IT "A" <br /> <br /> TASSAJARA RESERVOIR AND TRANSMISSION MAIN <br /> <br /> John Carollo Engineers <br /> November 23, 1988 <br /> <br /> SCOPE OF Isl)RK(a) <br /> <br />PHASE 1 - JOINT USE FEASIBILITY STUDY <br /> <br />Task 1.1 Data Collection <br /> <br /> 1.1.1 Obtain model of 1985 Pleasanton Water Master Plan on IBM PC <br /> format diskettes. Review commercial and industrial demand <br /> factors in 1985 study and compare to current and projected <br /> demands for North Pleasanton. <br /> <br /> ~. 1.2 Obtain near-term and long-term future demand data and pipe <br /> system data from DSRSD for two alternate system configurations <br /> for the study period of the Pleasanton Master Plan. The data <br /> should include average day, maximum day plus fire, maximum day <br /> and average day distributed over 24 hours, and operating para- <br /> mete rs. <br /> <br /> 1.1.3 Obtain existing, near-term future and long-term future demand <br /> data and pipe system data from Zone 7. The data should include <br /> average day, maximum day, maximum day and average day distri- <br /> buted over 24 hours, and operating criteria. <br /> <br /> 1.1.4 bleet with City personnel to discuss existing system operating <br /> conditions and any special system conditions of which we should <br /> be aware. <br /> <br /> 1.1.5 Obtain applicable operational data from each of the agencies on <br /> existing system performance to permit calibration of model. <br /> <br />Task 1.2 Develop Integrated Existing Pleasanton/Zone 7 System Model <br />1.2.1 Prepare integrated system node map. <br />1.2.2 Load electronic data for Pleasanton Water System Master Plan. <br />1.2.3 Input necessary data on Zone 7 system. <br />1.2.4 Conduct calibration runs. <br /> <br />(a) Tasks for Phases 2 through 5 subject to revision based on results of <br /> Phase 1. <br /> <br /> -1- <br /> <br /> <br />