My WebLink
|
Help
|
About
|
Sign Out
RES 88533
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88533
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2012 2:38:43 PM
Creation date
11/30/1999 11:15:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/15/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dist. Agmt. No. 4-1080-C <br /> <br />for PROJECT based on payments made to CITY's contractor. Billings <br />shall be submitted to STATE's Representative for approval and <br />forwarding for payment. <br /> <br /> (12) To pay all costs for upgrading of utility facili- <br />ties which may be relocated as part of PROJECT. <br /> <br /> (13) To construct the PROJECT in accordance with plans <br />and specifications of CITY, to the satisfaction of and subject to <br />the approval of STATE. <br /> <br /> (14) To administer the contract under the general <br />supervision of a Resident Engineer, who shall be a licensed Civil <br />Engineer in the State of California and qualified to perform the <br />functions of a Resident Engineer. The Resident Engineer shall be <br />a CITY employee. CITY's Resident Engineer shall comply with all <br />requests made by the STATE's Representative(s) within the limita- <br />tions of the Representative(s}' authorities as defined in Article <br />(14) of Section I of this Agreement. <br /> <br /> (15) That all contract administration procedures shall <br />conform to the requirements set forth in STATE's Standard Spec- <br />ifications and Construction Manual for construction of PROJECT. <br /> <br /> (16) To have CITY's consultant(s), if used, available <br />to interpret' the PS&E, and review and recommend approval of <br /> <br />change orders, required shop plans, falsework designs and other <br /> <br />working drawings during construction of the PROJECT. <br /> <br /> (17) To have CITY's consultant(s), if used, available <br />to make all necessary corrections and furnish the corrected prod- <br />uct to STATE if, during the course of construction, errors or <br /> <br /> -9- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.