Laserfiche WebLink
City of Pleasanton Proposal PR88056 <br />Geotechnical Investigation For October 5, 1988 <br />Road Failure-Evaluation Page 4 <br />Pleasanton, California <br /> <br /> SCHEDULE AND FEES <br /> <br />We would mobilize for this project within one week of your <br />approval and authorization to proceed. We anticipate that the <br />initial field work would take three days to complete. We <br />estimate that laboratory testing would be completed within two <br />weeks following completion of the field work. A progress report <br />summarizing subsurface soil conditions and the initial <br />inclinometer readings along with our preliminary conclusions <br />would be submitted within three to four weeks from the date of <br />commencement of the field exploration. A final report containing <br />our conclusions and recommendations with regard to the subject <br />roadway failure and containment and restoration schemes would be <br />submitted following the compiling and interpretation of <br />inclinometer data for a period of 3 to 6 months. <br /> <br />Our fee for this work would be computed in accordance with our <br />Fee Schedule. Based on this schedule, we estimate that total <br />charges for the scope of work outlined herein and performed over <br />a 6-month period would be $18,000-$20,000. An itemized breakdown <br />of the estimated charges is attached. We have assumed that you <br />will assure our unimpeded access to the site during the course of <br />this investigation. <br /> <br />We shall not be responsible for damage to underground utilities <br />or other installations unless they are accurately marked on plans <br />made available to us prior to beginning of field operations. <br /> <br /> BSK <br /> & Associates <br /> <br /> <br />