My WebLink
|
Help
|
About
|
Sign Out
RES 88528
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88528
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2012 2:37:11 PM
Creation date
11/30/1999 11:12:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/15/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br /> <br />Michael Fulford 24 October 1988 <br />Augustin Bernal Park <br />page 3 of 4 <br /> <br /> B. Prepare a separate set of contract documents (plans, <br /> specifications and estimate) for the parking lot adjacent to <br /> Golden Eagle Development, coordinating with existing and <br /> proposed circulation routes. Plans to be drawn at 1"=20' or <br /> appropriate scale and shall include existing conditions, <br /> layout of all landscape elements, paving, grading/drainage, <br /> and construction details. <br /> <br /> C. Provide contract documents for other site improvements such <br /> as fencing and drinking fountains. <br /> <br /> Submit all plans to City for review and approval and proceed with <br /> preparation of contract bid documents. Assist City in analyzing <br /> bids. <br /> <br /> 4. Construction Administration (Optional Task) <br /> <br /> Attend construction inspections, review change order requests, <br /> review shop drawings, and inspect specialized construction <br /> items. <br /> <br />TERMS OF PROPOSAL <br /> <br />All work performed herein shall be performed on a time and materials basis <br />not to exceed SX6,880 based upon the enclosed fee schedules (does not <br />include Task #4, ConstructiOn Administration, which would be billed on a <br />time and materials basis based upon the enclosed fee schedules at the <br />option of the client. We estimate this task will not exceed $1,500.}. <br />We will submit invoices to you monthly during the project progress, and <br />these invoic~m are due and payable within 30 days. A final bill will be <br />submitted afterTcompletion of the Construction Documents. <br /> <br />This fee includes time and expense for plan presentation(s) to City staff <br />and to the Commission, travel, telephone, reproduction, etc. We estimate <br />that completion time for this project will not exceed 60 days. <br /> <br />If this proposal meets with your approval, please sign both copies of this <br />letter, save the original for your records and return the other copy to <br />our office as authorization to proceed. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.