My WebLink
|
Help
|
About
|
Sign Out
RES 88489
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88489
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2012 2:05:49 PM
Creation date
11/30/1999 10:51:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/18/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
agencies and initiating meetings for review and investigation <br />in the office and/or the field to resolve utility relocation <br />requirements. Prepare plans, drawings, and other material <br />for use in completing easement and/or right-of-way <br />requirements for relocation of utilities. <br /> <br />The work included in this task is not part of the work <br />covered in the fixed price portion of this AMENDMENT; method <br />of payment shall be as established in this AMENDMENT. <br /> <br />TASK 2-2: FINAL DESIGN <br /> <br />The purpose of this task is to perform the detailed design <br />of the project and produce the construction drawings, spe- <br />cial provisions, and construction estimate in Caltrans for- <br />mat required for the contract documents. The contract docu- <br />ments will cover the work necessary to bid and construct the <br />bridges, ramps, freeway auxiliary lanes, and roadway sec- <br />tions included in the project. Final design will be based <br />on the GAD, Hydraulics Report, Materials Report, and Bridge <br />Type Selection Study prepared under Amendment 1. <br /> <br />Final design of the project shall be divided into two dis- <br />tinct phases: <br /> <br /> Phase 1: Rough grading and drainage. <br /> Phase 2: Fine grading and all remaining work. <br /> <br />A separate contract document suitable for bidding shall be <br />produced for each phase. The phases shall be developed and <br />coordinated with CITY staff to optimize use of borrow exca- <br />vation furnished from outside sources as well as future CITY <br />plans for adjacent facilities. <br /> <br />It is further understood that this SCOPE OF SERVICES and <br />fixed price includes the design and coordination work for <br />the addition of the auxiliary lanes on 1-580 described in <br />the BACKGROUND section of this SCOPE OF SERVICES and does <br />not include any work or costs associated with providing <br />additional lanes beyond those noted. <br /> <br />It is also understood that auxiliary lane widening will be <br />contained within the existing right-of-way using fill slopes <br />and/or standard Caltrans retaining walls. <br /> <br />The CONSULTANT shall advance the design of the Ultimate In- <br />terchange as defined by the GAD to approximately the 30 per- <br />cent complete level prior to commencing development of the <br />final design of the Interim Interchange. The Interim Inter- <br />change configuration will not preclude the future development <br />of the Ultimate Interchange geometrics. <br /> <br /> - 5 - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.