Laserfiche WebLink
3. Year 2010 ABAG traffic volumes including improvements <br /> to the 1-580/I-680 interchange <br /> <br />Apply the data to the proposed Stoneridge Drive interchange <br />geometrics for each peak hour for each scenario to evaluate <br />approximate vehicle storage requirements to provide the CITY <br />with sufficient information to select the appropriate design <br />year traffic volumes. <br /> <br />Task 2--Earthwork Change Order <br /> <br />Develop final grading plans for Caltrans to use in prepara- <br />tion of the construction change order for their contractor <br />to place compacted ramp embankments using the waste material <br />from the Caltrans 1-680 widening project south of 1-580. <br />Prepare plans, profiles, superelevation diagrams, cross <br />sections and other necessary information to define the con- <br />struction. Meet with Caltrans and CITY representatives to <br />define project requirements. <br /> <br />Coordinate the site drainage and adjust the grading to obtain <br />natural drainage for the final condition. <br /> <br />Prepare quantity and cost estimates needed to evaluate the <br />proposed work and alternative plans for comparison by the <br />CITY and Caltrans. Meet with the CITY, Caltrans, and <br />Caltrans' 1-680 widening project contractor to coordinate <br />location and final placement of the necessary embankments. <br />The estimated fee for this task includes the appropriate <br />credit for the work required which was already included in <br />the scope of work and fee for the related tasks in Amendment <br />No. 3 for the final design of the Stoneridge Drive <br />Interchange. <br /> <br />Task 3--Drainage <br /> <br />Revise completed desig9 of drainage facilities and coordinate <br />with the on-going Caltrans 1-680 Widening project. Revise <br />existing drainage components to fit the revised design ele- <br />ments. The estimated fee for this task includes the appro- <br />priate credit for the work required which was already <br />included in the scope of work and fee for the related tasks <br />in Amendment No. 3 for the final design of the Stoneridge <br />Drive Interchange. <br /> <br /> Task 3-1: Modify Completed Designs--Modify the <br /> existing and completed drainage facilities that were <br /> designed for the original work scope. Provide the <br /> necessary coordination and assistance to develop <br /> appropriate drainage to fit the advanced grading plan <br /> developed in Task 2. <br /> <br /> <br />