My WebLink
|
Help
|
About
|
Sign Out
RES 88474
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2012 1:37:34 PM
Creation date
11/30/1999 12:44:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/4/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 5-A <br /> <br /> AMENDMENT NO. 5 <br /> STONERIDGE DRIVE INTERCHANGE <br /> <br /> SCOPE OF SERVICES <br /> <br /> BACKGROUND <br /> <br />During the course of project development, the CONSULTANT has <br />provided the services as contained in Amendment No. 3 to the <br />Contract for Consulting Services dated July 2, 1985 as well <br />as additional services which were outside the scope of that <br />Amendment. The purpose of this AMENDMENT is to recognize, <br />accept, and compensate the CONSULTANT for the additional <br />work performed that was outside the original project work <br />scope and to authorize the CONSULTANT to proceed with addi- <br />tional work to complete the design and support construction <br />of the Stoneridge Drive Interchange as described in this <br />AMENDMENT. <br /> <br /> SCOPE OF SERVICES <br /> <br /> The CONSULTANT's work authorized by this AMENDMENT is cate- <br /> gorized as: <br /> <br />Category 1. Extra work created by changed conditions <br /> beyond the original project work scope autho- <br /> rized by Amendment No. 3, Tasks 1 through 13. <br /> Also, the additional work required to resolve <br /> disputed property boundaries adjacent to the <br /> project site, Task 14, is included in this <br /> category. <br /> <br /> Category 2. Additional work required to provide services <br /> during construction~ Task 15. <br /> <br />CATEGORY 1 <br /> <br />Task 1--Traffic Anglysis <br /> <br />Collect appropriate traffic data and perform preliminary <br />volume/capacity analyses for both AM and PM peak hours for <br />various operational scenarios including: <br /> <br />1. Planned NPID buildout <br /> <br />2. Year 2010 ABAG traffic volumes without improvements to <br /> the 1-580/I-680 interchange <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.