Laserfiche WebLink
Est. Item <br />Item Item of Work Unit Qty. Price Total <br /> <br />BASE BID (Cont.) <br />Phase V <br /> <br />Electrical Work {Areas 2 & 4~ <br /> <br /> 69 Trenching for Underground <br /> Utility Lines L.F. 810 9.00 7,290.00 <br /> <br /> 70 Sand Backfill L.S. L.S. 1,070.00 1,070.00 <br /> 71 Conduit L.F., 2,480 2.50 6,200.00 <br /> 72 Pull Wire L.F. 330 .30 99.00 <br /> 73 Telephone Box EA I 440.00 440.00 <br /> <br /> 74 Concrete Pad complete <br /> with Guard Posts and <br /> Ground Rods for Utility <br /> Compoany Transformer EA i 850.00 850.00 <br /> <br /> 75 Trench for Underground <br /> Circuits and Pull Boxes <br /> for Lights in .Parking <br /> Lot "H" L.F. 668 1.90 1,269.20 <br /> <br /> 76 Conduit L.F. 1,480 1.60 2,368.00 <br /> 77 Electrical Wires L.F. 4,800 .65 3,120.00 <br /> 78 Hand Holes EA 13 70.00 910.00 <br /> <br /> 79 Luminares for Parking <br /> Lot "~" EA 13 510.00 6,630.00 <br /> <br /> 80 Poles EA 13 925.00 12,025.00 <br /> 81 Concrete Bases EA 13 375.00 4,875.00 <br /> 82 Primary Splice Box EA 1 2,025.00 2,025.00 <br /> <br />Restroom/Snackbar (Area 4) <br /> <br /> 83 Restroom/Snackbar Site- <br /> work, Concrete Pad & <br /> Building (Provide Break- <br /> down of Costs) L.S. L.S. 115,000.00 115,000.00 <br /> <br /> 84 Restroom/Snackbar <br /> Mechanical & Plumbing L.S. L.S. 20,000.00 20,000.00 <br /> <br /> <br />