Laserfiche WebLink
Est. Item <br />Item Item of Work Unit Qty. Price Total <br /> <br />BASE BID (Cont.) <br />Phase V <br /> <br />Restroom/Snackbar {Area 4) <br /> <br /> 85 Restroom/Snackbar <br /> Electrical L.S. L.S. 12,150.00 12,150.00 <br /> <br /> 86 4" VCP L.F. 72 16.25 1,170.00 <br /> 87 6" VCP L.F. 243 32.00 7,776.00 <br /> 88 Sanitary Clean-Outs EA 1 415.00 415.00 <br /> 89 Sanitary Manhole EA 2 1,135.00 2,270.00 <br /> 90 2" Potable Water Supply L.F. 210 7.00 1,470.00 <br /> 91 2" Water Service & Meter EA 1 635.00 635.00 <br /> <br /> 92 Wet Tap Existing Water <br /> Main 'EA 1 315.00 315.00 <br /> <br />Sports Park Drive Improvements (Areas ~1, 2 & 3) <br /> <br />93 Vertical Curb (18") L.F. 270 12.00 3,240.00 <br />94 Vertical Curb (24") L.F. 310 14.00 4,340.00 <br />95 Vertical Curb (Tack-on) L.F. 105 8.80 924.00 <br />96 Curb & Gutter L.F. 800 10.00 8,000.00 <br />97 Curb & Gutter Removal L.F. 475 2.00 950.00 <br />98 Curb Removal L.F. 503 2.00 1,006.00 <br />99 AC BermRemoval L.F. 320 1.25 400.00 <br />100 3" AC on 9" AB S.F. 8,405 1.40 11,767.00 <br />101 9" deep lift A.C. S.F. 50 11.00 550.00 <br />102 AC Overlay S.F. 6,630 1.30 8,619.00 <br /> <br />103 Fog Seal (Lot "C" & <br /> Entry Road) S.F. 67,000 .02 1,340.00 <br /> <br />104 AC Removal S.F. 3,300 .20 660.00 <br /> <br /> <br />