Laserfiche WebLink
Est. Item <br />Item Item of Work Unit Qty. Price Total <br /> <br />BASE BID (Cont.) <br />Phase V <br /> <br />Restroom Buildinq (Area 2) (Cont.) <br /> <br />124 Restroom Building & <br /> Concrete Pad (Provide <br /> detailed Breakdown of <br /> Costs) L.S. L.S. 50,000.00 50,000.00 <br /> <br />125 Restroom Mechanical & <br /> Plumbing L.S. L.S. 14,850.00 14,850.00 <br /> <br />126 Restroom Electrical L.S. L.S. 4,475.00 4,475.00 <br /> <br />127 Electrical to Girls' <br /> Softball Snackbar L.S. L.S. 840.00 840.00 <br /> <br />128 4" VCP L.F. 225 20.00 4,500.00 <br />129 6" VCP L.F. 200 40.50 8,100.00 <br />130 Sanitary Clean-Out EA i 415.00 415.00 <br />131 Sanitary Manhole EA i 1,100.00 1,100.00 <br />132 2" Water Line L.F. 245 7.00 1,715.00 <br /> <br />133 2" Water Service w/ <br /> Meter EA 1 635.00 635.00 <br /> <br />134 Wet Tap Existing Water <br /> Main EA I 320.00 320.00 <br /> <br />135 Secondary Pull Box EA i 440.00 440.00 <br /> <br />136 Trench for Underground <br /> Utility Lines L.F. 250 15.00 3,750.00 <br /> <br />137 Sand Backfill L.S. L.S. 355.00 355.00 <br />138 Conduit L.F. 270 2.80 756.00 <br />139 Pull Wire L.F. 270 .30 81.00 <br /> <br /> TOTAL ............................... $1,4021841.00 <br /> <br /> <br />