2382
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1983
>
2382
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 12:38:23 PM
Creation date
7/31/2007 11:43:52 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/9/1983
DOCUMENT NO
2382
DOCUMENT NAME
GP-81-30
NOTES
PRUDENTIAL INSURANCE COMPANY OF AMERICA AND CALLAHAN-PENTZ
NOTES 2
DEVELOPMENT PLAN APPROVAL OF A 573 ACRE PORJECT HACIENDA BUSINESS PARK
NOTES 3
PLEASANTON
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C <br />89. That approval of the on-site water supply and distri- <br />bution system be withheld pending final design <br />and until the developer has demonstrated to the <br />satisfaction of the City Engineer that the proposed <br />system meets both the immediate and long range <br />requirements for supplying water in this area. <br />90. That the developer comply with any and all <br />applicable requirements of the cross-connection <br />control and backflow prevention device programs <br />required by the California Administrative Code, <br />Title 17. <br />91. That the developer pay the estimated applicable Zone 7 <br />and City connection fees and the meter cost prior to <br />Council approval of the development for any water <br />meters (irrigation meters) not directly related <br />to a building permit. -- <br />92. That a separate water meter be provided to each <br />lot of record within the development unless <br />otherwise approved by the City Engineer. <br />93. That approval of the sanitary sewer system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the proposed system is adequate, <br />connects to an approved point of discharge, and <br />meets both the immediate and long-range require- <br />ments of the sanitary sewer system in this and all <br />tributary areas. <br />94. That a separate sanitary sewer lateral be provided <br />to each lot of record within the development unless <br />otherwise approved by the City Engineer. <br />95. That approval of the storm drainage system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the system is adequate, connects to an <br />approved point of discharge, meets any and all <br />applicable requirements of the Alameda County Flood <br />Control District - Zone 7 meets any and all applicable <br />requirements of the Federal Emergency Management Flood <br />Hazard Program, and meets the immediate and long-range <br />requirements of this development and all upstream <br />areas intended to be drained through this tract. <br />96. That electric power distribution, gas distribution, <br />communication service, and any required alarm systems <br />be installed underground in a joint utility trench <br />unless otherwise specifically approved by the City <br />Engineer. Exhibit "B", Planning <br />Commission Resolution <br />No. 2382, 10/26/83, <br />Page B-17 <br />