My WebLink
|
Help
|
About
|
Sign Out
2230
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1982
>
2230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2010 2:02:27 PM
Creation date
7/31/2007 8:23:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/13/1982
DOCUMENT NO
2230
DOCUMENT NAME
PUD-82-21
NOTES
KEN EARP, ET AL
NOTES 2
PUD APPROVAL FOR 244 MANUFACTURED HOUSING PROJECT ON 29 ACRE SITE
NOTES 3
N. OF VINEYARD AVE. OPPOSITE SAUTERNE WAY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
17. That 6" vertical concrete curbs be installed between <br />all paved and landscaped areas. <br />18. That all utilities required to serve the development <br />be installed underground. <br />19. That the applicant enter into an agreement with the <br />City approved by the City Attorney which guarantees <br />that all landscaping included in this project will <br />be maintained in a healthful, attractive and weedfree <br />manner. Said agreement shall run with the land for <br />the duration of the existence of the structures <br />located on the subject property. <br />20. That the developer install street trees as required <br />per ordinance. <br />21. That any damage to street improvements now existing or <br />done during construction on the subject property be <br />repaired at full expense to the developer. <br />22. That lighting shall be approved by the Police Department. <br />23. That the developer install street frontage improvements <br />per ordinance and to the satisfaction of the City <br />Engineer. These improvements may include, but are not <br />necessarily limited to, grading, curb and gutter, <br />sidewalk paving, storm drain, sanitary sewer, water <br />facilities, street lighting, underground utilities, <br />and traffic control devices. <br />24. That the site be kept free of fire hazards from the <br />start of construction to final inspection and that the <br />Fire Department emergency number be provided adjacent <br />to all telephones on the site. <br />25. That all dwelling units in the development be constructed <br />to meet the latest P.G.&E. Energy Conservation Home <br />Standards. <br />26.. That the following water conserving plumbing fixtures <br />be installed: a) low flush water closets; b) shower <br />flow control heads; c) aerators in interior faucets; <br />and d) insulation of hot water lines. <br />A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.