My WebLink
|
Help
|
About
|
Sign Out
2187
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1980-1989
>
1982
>
2187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:34:29 AM
Creation date
7/26/2007 10:59:53 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/24/1982
DOCUMENT NO
2187
DOCUMENT NAME
TRACT 4914
NOTES
VERMILLION DEVELOPMENT COMPANY
NOTES 2
SUBDIVISION
NOTES 3
N OF DEL VALLEY PKWY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
18. That approval of the sanitary sewer system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the proposed system is adequate, <br />connects to an approved point of discharge, and <br />meets both the immediate and long-range require- <br />ments of the sanitary sewer system in this and all <br />tributary areas. <br />19. That a separate sanitary sewer lateral be provided <br />to each lot of record within the development unless <br />otherwise approved by the City Engineer. <br />20. That approval of the storm drainage system be with- <br />held pending final design and until the developer <br />has demonstrated to the satisfaction of the City <br />Engineer that the system is adequate, connects to an <br />approved point of discharge, meets any and all appli- <br />cable requirements of the Alameda County Flood Control <br />District - Zone 7, meets any and all applicable require- <br />ments of the Federal Emergency Management Flood Hazard <br />Program, and meets the immediate and long-range <br />requirements of this development and all upstream <br />areas intended to be drained through this tract. <br />21, That electric power distribution, gas distribution, <br />communication service, and any required alarm systems <br />be installed underground in a joint utility trench <br />unless otherwise specifically approved by the City, <br />Engineer. <br />22. That the developer be responsible for the installa- <br />tion of the street lighting system within the <br />development. The street lights shall be 70 watt, <br />high pressure sodium vapor units mounted on gal- <br />vanized steel poles with poured in place bases, <br />on the LS-1C schedule per City requirements and <br />P.G.andE. standard details unless otherwise <br />specifically approved. Approval for the number, <br />location, and type of electroliers shall be <br />withheld pending final design and review by the <br />City Engineer. <br />23. That in-lieu park dedication fees be collected by <br />the City prior to approval of the final map at the <br />rate then in effect and for the total number of <br />lots in the final map, unless this requirement <br />has been otherwise satisfied. <br />A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.