Laserfiche WebLink
EXHIBIT "A" <br />CONDITIONS OF APPROVAL <br />(PUD-85-8-1D) <br />1. That the development shall be substantially as shown on the <br />site plan, elevations, grading plan, etc., Exhibit A, on file <br />with the Planning Department. <br />2. That a traffic signal located at the intersection of <br />Tassajara Road and I-580 westbound off-ramp receive Caltrans <br />approval and be bonded for prior to issuance of any building <br />permits for the proposed project. <br />3. That the proposed mitigation measure for the intersection of <br />Santa Rita Road at I-580 eastbound ramps/Pimlico receive <br />Caltrans approval and be bonded for prior to the issuance of <br />any building permits for the project. <br />4. That all final Caltrans/Federal Highway Administration <br />approval for the second phase (second bridge) of the Hopyard <br />Road/I-580 interchange improvements be issued prior to the <br />issuance of any building permits for the project. <br />5. That the proposed six-story building be revised such that <br />indirect roof access is provided utilizing the Fire <br />Department's accessing ladder. <br />6. That approval of this project includes both the Phase I and <br />Phase II portions of the proposal. The Phase II portion of <br />the project will not have to receive another future approval <br />of the City unless otherwise determined by the Planning <br />Director. <br />7. The developer shall install an 8 ft. wide sidewalk along <br />Rosewood Drive from the end of the existing sidewalk at Owens <br />Drive to the terminus of the existing sidewalk on the west <br />side of Old Santa Rita Road or stripe a temporary bike lane <br />westbound on Rosewood Lane until the north side sidewalk is <br />installed. <br />8. The developer shall cause traffic signals to be designed and <br />installed at the main entrance driveway along Rosewood <br />Avenue. <br />9. That the developer shall be required to reapply for Planning <br />Commission review and City Council approval prior to the <br />installation of any on-site parking spaces in excess of 4000. <br />10. That approval of this project shall not become effective <br />until the effective date of the adopting ordinance approving <br />the Hacienda Business Park Phase II Planned Unit Development. <br />- 3 - <br />