Laserfiche WebLink
REIMBURSEMENT AGREEMENT FOR <br /> <br /> PARCEL ~ 5676 OFF-SITE IMPROVEMENTS <br /> <br /> THIS AGREEMENT is entered into at Pleasanton, California, this <br /> day of , <br /> , a municipal corporation <br />("City") and DIXIE KAMP and DIXIE KAMP AS TRUSTEE OF THE DIXIE <br />ROSALIND McCLLrRE KAMP REVOCABLE TRUST ("Developer") with reference to <br />the following facts. <br /> <br /> A. Developer is the owner of certain real property in the City <br />of Pleasanton, County of Alameda, State of California, commonly known <br />as Parcel Map 5676 (the "Property"). Developer has obtained City <br />approval of a tentative subdivision map for a 2 lot residential <br />subdivision to be constructed on the Property. <br /> <br /> B. In connection with construction described above, Developer <br />intends to construct or cause to be constructed certain improvements <br />in Trenery Drive right-of-way area, which improvements will benefit <br />the Property and other properties more fully described below. <br /> <br /> C. Pursuant to the Subdivision Map Act (California Government <br />Code, Sec. 66410 et seq), Developer is entitled to reimbursement for <br />certain costs of the improvements referred to above. City will <br />inspect and accept said improvements and is willing to administer the <br />reimbursement costs to Developer as set forth herein. <br /> <br /> NOW, THEREFORE, IT IS AGREED AS FOLLOWS: <br /> <br /> 1. Improvements. <br /> <br /> a. Certain construction work subject to reimbursement to <br />be performed by Developer, consisting of the approximately 218 feet of <br />Trenery Drive which includes, but is not limited to, fire hydrant, <br />sewer line and water line, plus related public improvements, will <br />benefit other properties in addition to the Property. Developer is <br />entitled to recover the costs of such construction work from other <br />properties which benefit from these improvements. The construction <br />work to be performed by Developer and included in the off-site <br />improvements is eligible for reimbursement hereunder (collectively, <br />the "Improvements") shall include the work described on Exhibit "A" <br />hereto, which shall be performed at an estimated cost as shown <br />thereon. <br /> <br /> b. The reimbursement fee shall be based upon the estimates <br />of construction cost included in Exhibit A. Within 60 days after <br />completion of the job, Developer shall submit actual costs of the <br />construction work, certified by Developer, to the City Engineer. <br />Thereafter, reimbursement fees shall be based upon actual costs. <br /> <br /> - 1 - <br /> <br /> <br />