Laserfiche WebLink
60. The applicant shall implement the following measures with the construction of the <br />office building covered by this approval so that aroof-mounted photovoltaic <br />system can be installed in the future: <br />a. Install electrical conduit and pull string from the roof/attic areas to the <br />building's main electrical panel; <br />b. Engineer the roof trusses to handle an additional load as determined by <br />a structural engineer to accommodate the additional weight of a typical <br />photovoltaic system beyond that anticipated for roofing; and <br />c. Provide an area near the electrical panel for the "inverter" required to <br />convert the direct current output from the photovoltaic panels to <br />alternating current. <br />These measures shall be indicated on the building permit plan sets. <br />BUILDING <br />61. The building shall meet the applicable Title 24 state energy requirements. <br />62. All building and/or structural plans must comply with all codes and ordinances in <br />effect before the Building and Safety Division will issue permits. <br />63. The applicant shall submit a building survey and/or record of survey and a site <br />development plan in accordance with the provisions of Chapter 18.68 of the <br />Municipal Code of the City of Pleasanton. These plans shall be approved by the <br />Chief Building Official prior to the issuance of a building permit. The site <br />development plan shall include all required information to design and construct <br />site, grading, paving, drainage, and utilities. Specific items to be indicated on the <br />site development plan necessary to construct the improvements are to be in <br />accordance with the City of Pleasanton Private Development Design Guidelines <br />adopted April 15, 1986. <br />64. The applicant shall submit 3 full-size sets of construction plans (wet-stamped and <br />signed), 2 sets of the necessary structural and Title 24 calculations, 2 copies of a <br />site specific soils report, and the completed Building Permit Questionnaire to the <br />Building and Safety Division, along with the necessary fees, to initiate the City's <br />plan check process. The plan check will be accepted only after the completion of <br />the Design Review procedure's 15-day appeal period, unless the applicant submits <br />a signed statement acknowledging that the plan check fees maybe forfeited in the <br />event that the approval is overturned or the design is significantly changed as the <br />11 <br />