My WebLink
|
Help
|
About
|
Sign Out
13 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
071707
>
13 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2007 12:55:44 PM
Creation date
7/11/2007 11:56:59 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/17/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
13 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department. <br />40. There shall be no truck deliveries, parking lot sweeping, or leaf blowing between <br />the hours of 10:00 p.m. and 6:00 a.m. <br />41. All construction activities shall be limited to the hours of 8:00 a.m. to 5:00 p.m., <br />Monday through Friday. In addition, no construction shall be allowed on Federal <br />Holidays. Interior construction activities taking place completely within the <br />enclosed structure (i.e., building walls, windows, doors, and roof installed) may be <br />conducted on Saturdays from 8:00 a.m. to 5:00 p.m., provided that all windows <br />and doors have been installed and remain closed during interior construction <br />activities. The Planning Director may allow earlier "start-times" for specific <br />construction activities (e.g., concrete-foundation floor-pouring), if it can be <br />demonstrated to the satisfaction of the Planning Director that the construction and <br />construction traffic noise will not affect nearby residents. All construction <br />equipment must meet Department of Motor Vehicles (DMV) noise standards and <br />shall be equipped with muffling devices. <br />42. A construction trailer shall be allowed to be placed on the project site for daily <br />administration/coordination purposes during the construction period. At no time <br />shall campers, trailers, motor homes, or any other vehicle be used as living or <br />sleeping quarters on the construction site. All such vehicles shall be removed <br />from the site at the end of each workday. <br />43. All excess soil from the site shall be off-hauled from the site and disposed of in a <br />lawful manner. No stockpiling of dirt on this site shall occur without specific <br />review and approval by the Planning Department. <br />44. Dust and mud shall be contained within the boundaries of the property during <br />times of construction. The project developer shall submit a dust control plan or <br />procedure as part of the building permit plans. <br />45. The project developer shall submit a waste generation disposal and diversion plan <br />to the Building and Safety Division prior to issuance of building or demolition <br />permits. The plan shall include the estimated composition and quantities of waste <br />to be generated and how the project developer shall recycle at least fifty percent <br />(50%) of the job site construction and demolition waste. Proof of compliance <br />shall be provided to the Chief Building Official prior to the issuance of final <br />occupancy. During demolition and construction, the project developer shall mark <br />all trash disposal bins "trash materials only" and all recycling bins "recycling <br />materials only". The project developer shall contact Pleasanton Garbage Service <br />for all waste disposal. Only that portion of trash and recycling waste refused by <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.