My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
071707
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2007 11:41:11 AM
Creation date
7/11/2007 11:41:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/17/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
smaller and smaller in relation to the level of the roadway. In such instances, the old <br />pavement needs to be removed prior to curb and gutter work. <br />On Black Avenue the old pavement was successfully removed, allowing reuse of the <br />existing curb and gutter, at a significant cost savings. In removing the pavement in the <br />gutter pan on Division Street, it was discovered that the existing curb and gutter was not <br />monolithic (i.e. built as a single unit). Instead, the gutter was constructed independent <br />of the curb, and in fact, the gutter portion has settled. Additionally, the pavement <br />thickness constructed over the concrete gutter varies from 1 inch to 5 inches and the <br />curbing was constructed 8 inches tall instead of 6 inches (see Figure No. 3). As a result <br />of this discovery, greater quantities of asphalt and additional curb, gutter and adjacent <br />sidewalk and driveway, will need to be removed and replaced. The estimated cost of <br />this additional work is $65,000, the anticipated amount of proposed Change Order No.1, <br />to the Vanguard Construction contract. Staff recommends authorization to execute this <br />Change Order and the transfer of $65,000 from the Annual Street Resurfacing project <br />and leaving intact the original project contingency amount of $49,550 for additional work <br />or changes that occur during the construction phase. <br />Schedule <br />The proposed schedule for subject projects is as follows: <br />Approval of Plans & Specifications and Award of Contract: <br />Start of Construction: <br />End of Construction: <br />Submitted by: <br />~~`~~ <br />Rob Wilson <br />Public Works Director <br />Fiscal Review: <br />David P. Culver <br />Finance Director <br />Attachments: <br />1. Project Funding and Expenditure Table <br />06/19/07 <br />07/01 /07 <br />08/15/07 <br />Approved by: <br />Nelson Fialho <br />City Manager <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.