Laserfiche WebLink
In addition to the above, staff conducted a public hearing with each City commission, and the Economic <br />Vitality Committee regazding the identification of highest priority City Council priorities. This process <br />provides the Council with additional input regazding funding priorities for these projects. Commission <br />results are as follows: <br />CITY COMMISSION RANKING of COUNCIL PRIORITY PROJECTS <br /> <br />Number of <br />Commissions <br />Ranked High <br />Ci Council CIP Priorities Priori Fundin Status In CIP <br />Downtown Parking Improvements/ Alameda 4 Funding is available for parking improvements <br />Coun Trans ortation Corridor Ac uisition includin rail corridor ac uisition. <br />Bernal Community Park Phase I Lighted 4 Construction drawings undergoing final review <br />S orts Fields rior to biddin . <br />Fire Station 4 (Railroad Ave.) Conversion to 4 Currently in design phase with active community <br />Firehouse Arts Center fundraisin in ro ress. <br />Library and Civic Center Master Plan 4 The Library Existing Conditions Assessment and <br />(including potential for a permanent ACE Expansion/Relocation Report will be presented to <br />Station, TOD on SF Pro a the Council later this calendar ear. <br />Permanent ACE Train Location 4 Not current) funded in CIP. <br />Bernal Property Financing Plan 3 The Council is developing financing options. The <br /> Bernal Property Improvement Reserve has a <br /> balance of $4.4 million. <br />Short- and Long-Term Trail Improvements 3 Funding is directed to trail development with the <br />Including The Iron Horse Trail current balance and funding for next two years, <br /> prioritized to meet the City's share for extending <br /> the Alamo Canal trail under I-580 and the <br /> extension of the Iron Horse trail. <br />Alviso Adobe Community Park 2 Construction bids have been received and <br /> construction agreements may be approved prior to <br /> ado tion of this CIP. <br />Evaluate Bernal U er Field Im rovements 2 Not current) funded. <br />Gingerbread Preschool Playground 2 The Council has allocated $70K for project design <br />Im rovements studies. <br />Lions Wayside and Delucci Park 2 Project study will occur with the Firehouse Arts <br />Redevelo ment Center. <br />Photovoltaic Project 2 Currently, working with the City of Livermore on <br /> the Solar Cities ro'ect. <br />Second Bernal Bridge (crossing Arroyo De la 2 Project funding will be augmented with funding <br />La una Near Foothill Blvd. from rivate develo ment. <br />Youth Center and Community Center Master 2 Funding allocated for project study. <br />Plans <br />Downtown Specific Plan Implementation 1 Funding available for Downtown Specific Plan <br /> ro'ects as identified b the Ci Council. <br />Ha Valle B ass Road Financin Plan 1 Reserve of $1 million for road construction. <br />Staples Ranch Community Park 1 Parks and Recreation Commission has completed <br /> a ark use site Ian. <br />As part of the commission public meeting process, the Economic Vitality Committee requested the CIP <br />include information detailing the City's commitment to ongoing maintenance. of infrastructure. While <br />the Committee realizes the importance of new facilities that address the needs of residents, it also has a <br />strong focus on assuring infrastructure and existing facilities aze well maintained and capable of meeting <br />business needs. As a result, this CIP contains a significant amount of funding infrastructure, including <br />