Laserfiche WebLink
EXHIBIT B <br />CAPITAL IMPROVEMENT PROGRAM PROJECT SUMMARY <br />~nm_nu Tti.~,,,.ti~n~n~a <br />PROJECT NAME FY 2007-08 FY 2008-09 FY 2009-10 FY 2010.11 TOTAL COST <br /> <br />WATER <br />12" Pi line on Foothill Road South of Oak Tree Farm Drive 450,000 0 0 0 $450 <br />000 <br />Annual Re lacement of Water Meters <br />' 65,000 65,000 65,000 65,000 , <br />$260 <br />000 <br />Annual Water Re lacement Pro <br />ects 400,000 400,000 400,000 400,000 , <br />$1 <br />600 <br />000 <br />Bi-Annual Emer enc Water Generator Overhaul 50,000 0 50,000 0 , <br />, <br />$100 <br />000 <br />Water Tank Corrosion Re airs 300,000 0 0 0 , <br />$300 <br />000 <br />Bi-Annual Automated Meter Readin ReUofit 0 50,000 0 50,000 , <br />$100 <br />000 <br />Bi-Annual Control Valve Installations 0 170,000 0 170,000 , <br />$340 <br />000 <br />Bi-Annual Electrical Panel U rades and Restorations 0 40,000 0 40,000 , <br />$80 <br />000 <br />Bi-Annual Re lacement of Pol bu lene Service Laterals 0 100,000 0 100,000 , <br />$200 <br />000 <br />Bi-Annual Water Quali Im rovement Pro'ect 0 50,000 0 50,000 , <br />$100,000 <br />TOTAL WATER $1,265,000 $875,000 $515,000 $875,000 $3,530 <br />000 <br />SEWER , <br />Annual Sanita Sewer Main Re lacement & Im rovements 350,000 350,000 350,000 350,000 $1,400 <br />000 <br />Annual Sewer Maintenance Hole Im rovements 20,000 20,000 20,000 20,000 , <br />$80 <br />000 <br />Bi-Annual Emergency Generator Overhaul and Upgrade Sewer Pump , <br />Stations 50,000 0 50,000 0 $100 <br />000 <br />Bi-Annual Electrical Panel U rades 0 40,000 0 40,000 , <br />$80,000 <br />TOTAL SEWER $420,000 $410,000 $420,000 $410,000 $1,660 <br />000 <br />TOTAL ALL PROJECTS $17,176,291 $16,046,148 $8,571,530 $8,478,943 , <br />$50,272,912 <br />