My WebLink
|
Help
|
About
|
Sign Out
22
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
061907
>
22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2007 10:14:46 AM
Creation date
6/15/2007 10:05:59 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/19/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Includes 308 000 to complete the Foothill Road Widening project from Bernal Avenue and <br />Foothill Place and 1 060 000 for completion of the Old Stanley Road improvements including <br />repaving, curb and gutter and sidewalks. As indicated previously, in the event the City received <br />additional Congestion Management Agency grant funding, the Foothill Road Widening project <br />could be moved from FY 2009 to FY 2008. <br />Parks <br />• The City is in the process of completing design of a number of major parks related CIP projects <br />including the Bernal Phase I Lighted Sports Fields and the Firehouse Arts Theater. While there <br />are currently reserves for these projects, it is anticipated the final costs may exceed available <br />reserves. As mentioned previously, rather than increase funding to the reserves, staff anticipates <br />the City Council utilizing the CIPR to fund these and other significant Council priority projects. <br />Construction agreements for the Alviso Adobe project will likely be approved prior to adoption <br />of this CIP. <br />• Included is $1,060,000 for general trails improvements including partial funding for the <br />extension of the Alamo Canal Trail under I-580 and the Iron Horse trail from Santa Rita to <br />BART. It is anticipated that both projects will require and receive, additional funding from <br />outside sources/agencies. <br />• In Lieu Park Dedication fees are limited to projects related to acquiring parkland. A total of <br />$2,360,912 is included in the four years of the CIP to fund a reserve to acquire land for a new <br />community park(s). While the Council has not identified a specific park location or project for <br />this funding, one may develop as an outgrowth of the General Plan update process or in the <br />future as the City looks toward the development of not yet developed or underdeveloped <br />property. In addition, as part of the City's future fee study, there can be analysis regarding the <br />potential for expanding the use of this revenue to address park development needs as well as park <br />acquisition. <br />• A total of $111,00 is budgeted for completion of a Pedestrian Trail and Bicycle Lane Master Plan <br />that is being funded exclusively from Measure B revenue. Staff anticipates the Master Plan will <br />identify needs and lead to additional grant funding needed to complete trails projects. <br />• Over the past few years, the condition of City parking lots has deteriorated. To address this <br />situation, the CIP includes 500 000 to repave the Snorts and Recreation Park. Staff anticipates <br />including additional projects in future years to address this situation. <br />• Based on the success of maintaining consistent funding for trails improvements, this CIP <br />includes 100 000 for improvements to bicycle lanes in City roadways. This is a new project <br />consistent with Council priority. <br />• A total of 125 000 is included to construct a pedestrian and bicvcle path on Valley Avenue <br />between Case Avenue and Sunol Boulevard which is used heavily by elementary and middle <br />school students. The project is needed as part of the Valley Avenue Extension. <br />
The URL can be used to link to this page
Your browser does not support the video tag.