Laserfiche WebLink
PROJECTS SUBMITTED FOR ADDITIONAL FUNDING <br />CIP 2007-08/2008-09 <br />PROJECT DESCRIPTION Current Additional Revised <br /> Funding Balance Funding Total <br />PROJECTS SUBMITTED FOR ADDITIONAL FUNDING <br />Bernal Meadowlark Drive Street Im rovements $105,000 $95,000 $200,000 <br />Bridge Construction and Roadway Widening at Bernal $1,928,000 $2,819,900 $4,747,900 <br />Avenue at Arro o Del ValleNine and Avenue <br />Foothill Road Widening (East Side) From Bernal $262,000 $308,000 $570,000 <br />Avenue to Foothill Place <br />Mohr Avenue Sidewalk Construction from Kolln $49,000 $81,000 $130,000 <br />Street to Abandoned Railroad Ri ht-of-Wa <br />Old Stanley Boulevard Improvements: Main Street to $940,000 $1,060,000 $2,000,000 <br />First Street <br />Summary of Maior Funded Proiects Included in the CIP <br />Streets <br />• Provides a total of 9 000 000 over the four years of the CIP for street resurfacine. This amount <br />represents an increase of $1,000,000 over the $8,000,000 anticipated in the last CIP. The actual <br />streets to be resurfaced will be determined following an update to the City's pavement <br />management system. <br />• Includes $3,600,000 for various street related maintenance and improvement projects including <br />curb and gutter replacements ($600,000), slurry sealing ($1,00,000), installation of traffic <br />buttons and line markers ($400,000), sidewalk ramp installation ($680,000), sidewalk <br />maintenance ($800,000), and an evaluation of City streets ($120,000). The total amount <br />exceeds the $2,930,600 included in the previous CIP by $670,000. <br />• Includes 2 819 900 for construction of the Second Bridge over the Arroyo Del Valle at <br />Vineyard Avenue. This amount is in addition to an existing project balance of $1,928,000. <br />• Similar to previous years, this CIP does not include a project for funding installation of a traffic <br />signal pending completion of the General Plan that will provide general direction regarding new <br />or modified signalized intersections. However, included is $200,000 for design and potential <br />installation of a traffic signal at Santa Rita Road and Francisco Street. The City Council will <br />review the design prior to moving forward with installation. <br />• This CIP does not include additional funding for the Haply Valley Bypass Road. The current <br />project reserve is $1 million. Once development, road design and construction matters are <br />addressed, staff will prepare a recommendation regarding project funding. <br />