My WebLink
|
Help
|
About
|
Sign Out
09 ATTACHMENT 09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
061907
>
09 ATTACHMENT 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2007 10:59:06 AM
Creation date
6/15/2007 9:53:17 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/19/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
09 ATTACHMENT 9
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dowling Associates, Inc. <br />Transportation Engineering • Planning• Research • Education <br />The levels of service or the Existing+Approved+Project conditions are shown in <br />Table 6. The project does not result in a significant change in the level of service. <br />However, the project does add new peak hour trips through the intersection of <br />Stanley Boulevard & Bernal Avenue, which already operates at LOS E under <br />Existing+Approved conditions. The new 1-way stop controlled intersection on <br />Vineyard Avenue at the project driveway would operate at LOS A during both peak <br />hours. <br />Based on the project site plan available at the time of this traffic study, the project <br />driveway would be located at the end of a curved section of Vineyard Avenue 800 <br />feet westerly of Ruby Hill Boulevard. Sight distance to the west for vehicles exiting <br />the project site may be inadequate due to the driveway location on the inner side of <br />the curve and the existing trees on the south side of Vineyard Avenue. The posted <br />speed limit on Vineyard Avenue in the vicinity of the project site is 50 miles per <br />hour. <br />Table 6 <br />Intersections Levels of Service <br />Esistin¢ + Auuroved + Proiect <br /> Approved (2003 Approved + <br /> Intersection Traffic Time Plus Bernal) Proj ect <br /> Control <br /> Delay LOS Delay LOS <br />1 Stanley Bl. @ Valley Ave. Signal AM <br />2 Bernal Ave. @ Valley Ave. Signal AM 18.3 B 18.3 B <br /> 32.1 C 32.1 C <br />3 Vineyard Ave. @ Isabel Ave. Signal AM 10.5 B 10.5 B <br /> 11.4 B 11.3 B <br />4 Vineyard Ave. @ Ruby Hill Bl. Signal AM 37.9 D 38.4 D <br /> 10.6 B 10.6 B <br />5 Bernal Ave. @ Vineyard Ave. Signal AM 29.0 C 29.0 C <br /> 14.2 B 14.3 B <br />6 Vineyard Ave. @ Project Dr. 1-Way AM N/A N/A 0.0 A <br /> Stop N/A N/A 0.5 A <br />Source: Dowling Associates <br />Traffic Analysis page // <br />Ruby Hill Conversion, Pleasanton <br />
The URL can be used to link to this page
Your browser does not support the video tag.