Laserfiche WebLink
CITY as may be needed to coordinate their projects with the <br />final interchange design. <br /> <br />TASK 4--FRONTAGE ROAD <br /> <br />The CONSULTANT shall add the frontage road modifications to <br />relocate the existing frontage road in the NW quadrant of <br />the interchange. The design of the frontage road will <br />include horizontal and vertical alignment, roadway drainage, <br />signing, and striping. Revise completed design plans to in- <br />corporate the frontage road including; stage construction, <br />signing, striping, and median revisions to the Tassajara <br />Road plans. <br /> <br />TASK 5-WATERLINE <br /> <br />The CONSULTANT shall include the design of a water transmis- <br />sion line located in Tassajara Road and Santa Rita road for <br />the CITY. The design of the waterline will include hori- <br />zontal and vertical alignment, thrust block design, con- <br />struction details, specifications, coordination with the <br />bridge design, and coordination with the CITY. The water- <br />line design shall conform to CITY standards and shall meet <br />their approval. The portion of the waterline within <br />Caltrans jurisdiction shall be designed to meet their <br />standards. Both CITY and Caltrans shall review, comment, <br />and approve the final design plans. <br /> <br />TASK 6--HISCELLANEOUS SERVICES <br /> <br />The CONSULTANT shall provide general support and respond to <br />changes or additional work requested by the CITY during the <br />design phase of the interchange. The requested work will be <br />defined by separate Task Order covered under this section. <br />Each Task Order will be written as a letter agreement and <br />contain the scope of work, schedule, budget, and method of <br />payment. The Task Orders will be authorized individually by <br />signature of the Director of Public Works of the CITY OF <br />PLEASANTON. <br /> <br />TASK 7--PROJECT MANAGEMENT <br /> <br />The CONSULTANT shall provide the necessary project manage- <br />ment and administration to coordinate and manage the work <br />described in this AMENDMENT. Work shall be coordinated and <br />integrated with the ongoing related design work. <br /> <br />SF059/005.50 <br /> <br /> 2 <br /> <br /> <br />