Laserfiche WebLink
Exhibit 5-A <br /> AMeNDmENT NO. 5 <br /> 'HACIENDA DRIVE/I-580 INTERCHANGE <br /> SCOPE OF SERVICES <br /> <br /> BACKGROUND <br /> <br />During the course of project development~ the CONSULTANT has <br />provided the services as contained in Amendment No. 2 to the <br />Contract for Consulting Services dated October 18~ 1988~ as <br />well as additional services which were outside the scope of <br />that Amendment. The purpose of this AMENDMENT is to recog- <br />nize~ accept~ and compensate the CONSULTANT for the addi- <br />tional work performed that was outside the original project <br />workscope and to authorize the CONSULTANT to proceed with <br />additional work to complete the design of the Hacienda Drive <br />Interchange as described in this AMENDMENT. It ts also <br />recognized that the CONSULTANT has executed the work under <br />an accelerated completion schedule and will continue to <br />operated in this mode to complete the remainder of the <br />assigned work. <br /> <br /> SCOPE OF SERVICES <br /> <br />The CONSULTANTS work authorized by this AMENDMENT includes: <br />TASK 1--WESTBOUND DIAGONAL ON-RAMP (HR-3 RAMP) <br /> <br />The CONSULTANT shall add the westbound diagonal on-ramp to <br />the final design plans. Work shall include preparations of <br />alignment, grading, paving, drainage, lighting, signals, <br />signing, and striping plans. Work shall be incorporated <br />into the final interchange design. <br /> <br />TASK 2--FRONTAGE ROAD <br /> <br />The CONSULTANT shall add the frontage road modifications to <br />relocate the connection of the existing frontage road in the <br />NE quadrant of the interchange. The design of the frontage <br />road will include the horizontal and vertical alignment, <br />roadway drainage, signing, and striping. Completed design <br />plans shall be revised to include the relocated frontage <br />road. <br /> <br /> TASK 3--UTILITIES <br /> <br /> The CONSULTANT shall continue providing services to coor- <br /> dinate relocation of utilities needed to construct both the <br /> Hacienda Drive and Santa Rita Road interchanges. Work shall <br /> continue to plan, schedule, and coordinate the several re- <br /> <br /> <br />