Laserfiche WebLink
Task 2.6 Right-of-Way Engineering <br /> <br /> 2.6.1 Based on approved layouts from Task 1.5, prepare legal descrip- <br /> tions and plat maps for property and easement acquisitions for <br /> project facilities. <br /> <br /> 2.6.2 After staff review, submit to site property owner and attend <br /> meeting to address questions. <br /> <br />FHASE 3 FINAL [BSIGN ~ <br /> <br />Task 3.1 Prepare Plansm Specifications and Estimates (PS&E) <br /> <br /> 3.1.1 Prepare reservoir, access road and utility corridor construc- <br /> tion plans with civil, structural, mechanical, electrical/ <br /> telemetry/controls, and erosion control and landscaping <br /> details, incorporating applicable City Standards Details. <br /> <br /> 3.1.2 Prepare Transmisston Main plan and profile, TassaJara-Santa <br /> Rtta/I-580 I/C crossing details, installation details for <br /> approved alternate pipe materials, typical details for appur- <br /> tenances and traffic control details incorporating City <br /> Standard Details as appropriate. <br /> <br /> 3..1.3 Prepare specifications incorporating City Standards as appro- <br /> priate. <br /> <br /> 3.1.4 Progress submittals: Three sets of Plans and Specifications at <br /> 50 percent and 90 percent completion. <br /> <br /> 3.1.5 Perform constructibility review. <br />Task 3.2 Engineer's Construction Cost Estimate <br /> 3.2.1 Prepare Quantity take-off calculations. <br /> 3.2.2 Determine applicable estimated unit costs. <br /> 3.2.3 Prepare Engineer's Estimate <br />Task 3.3 Assist Cit7 in Obtaining Required Permits and Approvals <br /> <br />PHASE/~ BIDDINe <br /> <br />Task 4.1 Furnish Fifty. (50) Complete Sets of Bid Documents <br /> <br />Task 4.2 Attend Pre-Bid Conference to Present Project and Answer <br /> Questions <br /> <br /> -5- <br /> <br /> <br />