My WebLink
|
Help
|
About
|
Sign Out
RES 89346
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1989
>
RES 89346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2012 12:27:16 PM
Creation date
11/22/1999 11:31:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/15/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.2 Obtain current land use projections from the City Planning <br /> Department and compare ~rlth Hater Master Plan-land use assump- <br /> riot. <br /> <br /> 2.1.3 Obtain available record data and future planning information on <br /> streets, highways and utilities, and identify potential con- <br /> flicts or special conditions. <br /> <br /> 2.1.4 Meet with ~leasanton Water Maintenance Division and identify <br /> operations and maintenance requirements. <br /> <br /> 2.1.5 Contact permitting Jurisdictions and identify required <br /> approvals and permits: <br /> <br /> o CALTRANS <br /> o County of Alameda <br /> o Department of Fish and Game <br /> o City Public Works Department <br /> <br /> 2.1.6 Contact other third parties and identify desired degree of <br /> i nvolveme nt: <br /> <br /> o Reservoir site property owner <br /> o City of Dublin <br /> o DSRSD <br /> <br /> 2.1.7 Obtain and review available geotechnical reports; advise City <br /> on need for supplemental services. <br /> <br /> 2.1.8 Summarize DeSign Criteria from above information for City <br /> review. <br /> <br />Task 2.2 Topographic and Site Survey <br /> <br /> 2.2.1 Obtain and revie~ available topographic mapping and preliminary <br /> title reports of affected property. <br /> <br /> 2.2.2 Prepare new topographic map of reservoir site area, access road <br /> area and pipeline routes suitable for design. <br /> <br />Task 2.3 Supplemental Geotechnical Investigation <br />Task 2.4 Formulate and Evaluate Alternate Design.. Cencepts <br /> <br /> 2.4.1 Meet with reservoir site property owner and City of Dublin <br /> representatives regarding reservoir design concerns. <br /> <br /> 2.4.2 Develop preliminary alternate reservoir configurations, loca- <br /> tions and site layouts, together with alternate access road and <br /> utility corridor (inlet-outlet line, overflow/drain line and <br /> power) locations, preliminary right-of-way lines aesthetic <br /> analyses and preliminary cost estimates. <br /> <br /> -3- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.