Laserfiche WebLink
MII~I~IT "A" <br /> <br /> CITI O~ PLEA~ANTON <br /> TASSAJARA ~S~VOIR ~ ~ISSI~ ~N <br /> <br /> John Carollo ~n~n~ <br /> Nove~er 23, 1988 <br /> <br /> S~ ~ ~K(a) <br /> <br />~SE I - ~I~ USE ~ILI~ ~ <br /> <br />Task 1.1 Data Collection <br /> <br /> 1.1.1 0b~ain ~del of 1985 Pleasan~on Water Heater Plan on IBH PC <br /> for~ diskettes. Renew commrdal aM industrial demnd <br /> facEors in 1985 scudy and compare to curren~ and projected <br /> demnds for NotCh Pleasan~on. <br /> <br /> 1.1.2 0b~ain near-~erm and long-~e~ fuCure demM da~a and pipe <br /> system dace from DSRSD for ~vo alternate sysCem co~i~ra~tons <br /> for che stay period of ~he Pleasanton MasCer Plan. The da~a <br /> should include average day, maximum day plus fire, maxim~ day <br /> aM average day distributed over 24 hours, and operaCin~ pars- <br /> ~ers. <br /> <br /> 1.1.3 Obtain existing, near-~e~ future a~ long-~e~ future de~nd <br /> data and pipe system data from Zone ~, The dace should include <br /> average day, maximum day, maxi~m ~y and average day distri- <br /> buted over 24 hours, aM opera~i~ criteria. <br /> <br /> 1.1.4 Mee~ with City personnel to discuss e~s~in~ system operaCing <br /> condiCio~ and any special system condt~io~ of ~ich we should <br /> be aware, <br /> <br /> 1.1.5 0b~ain applicable operational da~a from each of ~he agencies on <br /> e~s~ing system performnce ~o per~ calibration of ~del. <br /> <br />Task 1.2 Develop Integrated ExisCin~ Pleasanton/Zone 7 System Model <br />1.2.1 Prepare int~ra~ed system n~e rap, <br />1.2,2 Load elec~ronic da~a for Pleasan~on WaCer System Mas~er Plan, <br />1.2.3 Input necessa~ da~a on Zone ~ syscem. <br />1.2,4 Conduct calibration runs. <br /> <br />(a) Tasks for Phases 2 through 5 subject to revision based on results of <br /> Phase 1. <br /> <br /> -1- <br /> <br /> <br />