My WebLink
|
Help
|
About
|
Sign Out
RES 89346
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1989
>
RES 89346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2012 12:27:16 PM
Creation date
11/22/1999 11:31:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/15/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MII~I~IT "A" <br /> <br /> CITI O~ PLEA~ANTON <br /> TASSAJARA ~S~VOIR ~ ~ISSI~ ~N <br /> <br /> John Carollo ~n~n~ <br /> Nove~er 23, 1988 <br /> <br /> S~ ~ ~K(a) <br /> <br />~SE I - ~I~ USE ~ILI~ ~ <br /> <br />Task 1.1 Data Collection <br /> <br /> 1.1.1 0b~ain ~del of 1985 Pleasan~on Water Heater Plan on IBH PC <br /> for~ diskettes. Renew commrdal aM industrial demnd <br /> facEors in 1985 scudy and compare to curren~ and projected <br /> demnds for NotCh Pleasan~on. <br /> <br /> 1.1.2 0b~ain near-~erm and long-~e~ fuCure demM da~a and pipe <br /> system dace from DSRSD for ~vo alternate sysCem co~i~ra~tons <br /> for che stay period of ~he Pleasanton MasCer Plan. The da~a <br /> should include average day, maximum day plus fire, maxim~ day <br /> aM average day distributed over 24 hours, and operaCin~ pars- <br /> ~ers. <br /> <br /> 1.1.3 Obtain existing, near-~e~ future a~ long-~e~ future de~nd <br /> data and pipe system data from Zone ~, The dace should include <br /> average day, maximum day, maxi~m ~y and average day distri- <br /> buted over 24 hours, aM opera~i~ criteria. <br /> <br /> 1.1.4 Mee~ with City personnel to discuss e~s~in~ system operaCing <br /> condiCio~ and any special system condt~io~ of ~ich we should <br /> be aware, <br /> <br /> 1.1.5 0b~ain applicable operational da~a from each of ~he agencies on <br /> e~s~ing system performnce ~o per~ calibration of ~del. <br /> <br />Task 1.2 Develop Integrated ExisCin~ Pleasanton/Zone 7 System Model <br />1.2.1 Prepare int~ra~ed system n~e rap, <br />1.2,2 Load elec~ronic da~a for Pleasan~on WaCer System Mas~er Plan, <br />1.2.3 Input necessa~ da~a on Zone ~ syscem. <br />1.2,4 Conduct calibration runs. <br /> <br />(a) Tasks for Phases 2 through 5 subject to revision based on results of <br /> Phase 1. <br /> <br /> -1- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.