My WebLink
|
Help
|
About
|
Sign Out
RES 89333
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1989
>
RES 89333
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2012 12:17:44 PM
Creation date
11/22/1999 11:13:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/1/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> July 27, 1989 <br /> Job No. 7969.000 <br /> <br /> · Analysis of total and differential settlements due to <br /> consolidation of uncompacted fill and debris under anticipated <br /> building loads, and alternative methods of mitigating <br /> structural damage due to settlement, including removal of <br /> unsuitable material and replacement with compacted fill, deep <br /> foundations embedded in firm native soils, or soil <br /> modification methods such as grouting or in-situ <br /> densification. <br /> <br /> · Drainage and grading recommendations, including removal of <br /> unsuitable material, and removal of abandomnemt of existing <br /> below grade structures. <br /> <br /> · Design criteria for selected type of foundation, including <br /> depth and width limitation, allowable bearing capacities, and <br /> lateral force coefficients. <br /> <br /> · Preliminary pavement design for proposed parking areas. <br /> FEE ESTIMATE <br /> <br /> We will provide our services on a time-and-expense basis in <br /> accordance with the terms of the attached Fee Scheduled - 1989, <br /> which is made a part hereof by reference. Our fee for the scope <br /> of services outlined above will be as follows: <br /> <br /> Desiqn Level Geotechnical Investiqation <br /> <br /> Field Exploration ...................................... $1,400 <br /> Laboratory Testing ..................................... 1,500 <br /> Analysis and Report .................................... 3,600 <br /> Total $6,500 <br /> <br /> We will not exceed $6,500 without prior authorization. <br /> <br /> The above estimated fee assume that hazardous or toxic materials <br /> will not be encountered during our field exploration, or in samples <br /> selected for laboratory analyses. If hazardous or toxic materials <br /> are encountered or suspected, client and BGC agree that such a <br /> discovery constitutes a condition mandating a redefinition of <br /> project scope and budget, or termination of services. <br /> <br /> This proposal remains valid for 60 days from the date hereon unless <br /> cancelled by either party of extended by mutual written agreement. <br /> Please return one signed copy of this letter as our formal <br /> authorization to proceed with our investigation. Preliminary <br /> results from our study will be transmitted verbally as they become <br /> available. We anticipate completion of our work within 4 to 6 weeks <br /> after authorization. <br /> <br />BERLOGAR GEOTECHNICAL CONSULTANTS <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.