My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
051507
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2007 11:14:37 AM
Creation date
5/11/2007 11:56:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/15/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 Attachments
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All storm drain lines within the public right-of-way shall be reinforced <br />concrete pipe (RCP). <br />k. Underground the existing overhead utilities along the Stanley Boulevard <br />project frontage from the east project boundary line and across Bernal <br />Avenue to the closest riser pole on the west side of the intersection. The <br />existing 60 KV lines shall remain overhead. <br />Increase the radius of the curb returns at the driveways along all public <br />streets to 20 feet measured along the back of curb. The driveways shall <br />be a street type opening with a valley gutter similar to City Standard Detail <br />121. <br />m. Increase the widths of the two entrance driveways from Bernal Avenue to <br />28 feet. <br />n. Eliminate the four-foot wide bio-swales within the parking area. <br />o. Modify the 8-foot wide bio-swales within the parking area to provide for <br />bio-treatment. There shall be a subdrain system installed beneath the <br />filtering media to collect any excess storm water in the bio-treatment area. <br />p. Eliminate the storm drain screen/filtration structures. <br />q. Drain the garden center to an on-site bio-swale area. The exact details of <br />the location and size of the bio-swale area shall be submitted to the City <br />Engineer and Planning Director for approval. <br />The utilities along the east property line shall be relocated further to the <br />west to allow for the installation of a sanitary sewer line along the drive <br />aisle at the rear of the property, tying into the bulb of Nevada Court. The <br />applicant shall dedicate to the City a 10-foot wide sanitary easement for <br />the installation of the sanitary sewer line. The applicant shall work with <br />staff at the subdivision stage to determine the location, size, and design of <br />the sewer line plus the timing of its installation, subject to the approval of <br />the City Engineer. Should it be determined that the applicant will install <br />the sewer line, the applicant may request a reimbursement agreement <br />with the City such that any other owner who benefits from the sewer pays <br />its pro-rata share of the cost of its installation. <br />s. Modify Stanley Boulevard to create a fourth, 18-foot wide east bound <br />acceleration/deceleration/bike lane between Bernal Avenue and the most <br />westerly driveway entrance and to create a third, 18-foot wide <br />through/bike lane from the driveway to the east property line as shown on <br />Exhibit "A", the project's site/engineering plans. This work shall include <br />Page 3 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.