My WebLink
|
Help
|
About
|
Sign Out
RES 90228
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1990
>
RES 90228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2012 2:44:47 PM
Creation date
8/13/1999 8:24:34 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/11/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. <br /> <br />11. <br /> <br />12. <br /> <br />13. <br /> <br />14. <br /> <br />that the landscaping has been installed in accordance with the <br />approved landscape plans with respect to size, number and <br />species of plants, and overall design concept. <br /> <br />If archaeologic materials are uncovered during grading, <br />trenching or other on-site excavation, earthwork within 30 <br />meters of these materials shall be stopped until a <br />professional archaeologist who is certified by the Society of <br />California Archaeology (SCA) and/or the Society of <br />Professional Archaeology (SOPA) has had an opportunity to <br />evaluate the significance of the find and suggest appropriate <br />mitigation measures if they are deemed necessary. <br /> <br />Exterior walls shall be free of air conditioning, heating or <br />other mechanical equipment. <br /> <br />Final inspection is required by the Planning Department prior <br />to occupancy. <br /> <br />Ail roof equipment must be located below the top of any <br />parapet wall to the satisfaction of the Planning Director. <br />Evidence to this effect shall be submitted to the Planning <br />Director prior to permit issuance. <br /> <br />The project shall comply with all requirements of the <br />Pleasanton Fire Department including those conditions outlined <br />in the plan review dated September 27, 1990 on file with the <br />Planning Department. <br /> <br />Any double check values servicing the site shall be shown on <br />the development plan for approval by the Planning Director <br />prior to the issuance of a building permit. These devices <br />shall be screened and painted to the satisfaction of the <br />Planning Director. <br /> <br />The angle of any adjacent irrigation sprinkler heads shall be <br />adjusted away from the direction of the building. <br /> <br />The color of the roof shall be a Patina copper color, <br />manufactured by Thermal Coating, or comparable. A sample of <br />the roof material shall be submitted for review and approval <br />of the Planning Department prior to issuance of building <br />permits. <br /> <br />The three Deodar Cedar trees located at the northwest corner <br />of the Stoneridge Drive/Hopyard Road street intersection shall <br />not be removed and shall be preserved. <br /> <br />15. <br /> <br />Ail trees to be preserved on site shall not be impacted by <br />construction activities. Should any tree be damaged to the <br />extent that its appearance, health or vigor is permanently <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.