My WebLink
|
Help
|
About
|
Sign Out
RES 90224
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1990
>
RES 90224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2012 2:43:40 PM
Creation date
8/13/1999 6:54:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/11/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to the requirements of the Act, so as to jointly pursue a cost- <br />effective, expeditious and well-coordinated approach for optimal <br />planning both at the local and county levels. The general <br />responsibilities of the Authority and Agencies are delineated in <br />this Agreement. <br /> <br />2. Duties of ~uthority <br /> <br />The Authority shall fund, contract for and coordinate, in a county- <br />wide sense, the activities and work program required to produce <br />SRRE's for the Agencies. These responsibilities shall specifically <br />include, but not necessarily be limited to, the following duties: <br /> <br />2.1 Levy fees sufficient to generate revenues to meet SRRE <br /> planning expenses. <br /> <br />2.2 Contract with consultant for SRRE work on behalf of the <br /> Agencies. <br /> <br />2.3 <br /> <br />Coordinate the Integrated Waste Management Advisory Task <br />Force participation in the SRRE effort. <br /> <br />2.4 <br /> <br />Coordinate public hearings and other public forums as <br />required on a county-wide basis. <br /> <br />2.5 <br /> <br />Assemble the SRRE's produced for the Agencies in a <br />comprehensive countywide document. <br /> <br />3. Duties of Agency <br /> <br />Each Agency shall work with the consultant retained by the <br />Authority and assure the production of a local SRRE which complies <br />with the requirements of the Act and also meets the specific needs <br />of the Agency. These duties shall include but not necessarily be <br />limited to the following efforts: <br /> <br />3.1 <br /> <br />Participate actively and assure that the local SRRE <br />process is completed on a timely basis to enable assembly <br />and submission of a countywide document. The Agency <br />shall not, however, be accountable for delays in the <br />completion of work which are the responsibility of the <br />Consultant. <br /> <br />3.2 <br /> <br />Provide day-to-day information, coordination and <br />direction to the consultant in developing the Agency <br />SRREo <br /> <br />3.3 <br /> <br />Designate an Agency SRRE project manager who shall be the <br />official contact person for the consultant, and to <br />participate in all project management meetings with the <br />Authority and Agencies. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.