Laserfiche WebLink
TDA 4.5 Document E(a) <br />Page 2 <br />The PPS area covers all of Pleasanton, its unincorporated areas, and Sunol. <br />Limited service to medical appointments in Livermore, Dublin, and San Ramon is <br />permitted to specific approved destinations. <br />Pilot Fixed Route Service <br />For PY 2007-08, PPS staff will be piloting a fixed route service. "I'he pilot Fixed <br />Route Service (FRS) will begin July 1, 2007, and continue through Tune 30, 2008. <br />This proposed program will provide a creative and cost-effective transit <br />alternative for PPS clients that have minimal mobility limitations. <br />The program will provide a bridge between existing Wheels fixed-route service <br />Lines and more costly door-to-door paratransit service. PPS riders will be able to <br />select the type of transit service that best fits their needs, which may vary with <br />weather conditions and personal health. <br />The pilot FRS will consist of apre-determined, scheduled route throughout <br />Downtown Pleasanton, requiring no reservations. Clients will be able to access <br />the route at any stop, at a cost of $1.25, no matter how many times they get on/off <br />the service during the same day. <br />1'he route will include seven (7) key Pleasanton senior housing locations and the <br />following highly requested Downtown stops: Pleasanton Senior Center, <br />Pleasanton Library, Main Street, Raley's Shopping Center, and Safeway <br />Shopping Center. A connection to Wheels at the Neal Street stop will allow free <br />transfers to other destinations such as BART, Stoneridge Shopping Center, and <br />Wal-Mart. The entire loop will not exceed 45-minutes from any key point of <br />entry. PPS Fixed Route Service will operate Monday-Thursday, from 9:00 a.m. to <br />4:00 p.m. <br />A separate FRS printed schedule and handbook will be produced. It is estimated <br />that 4,000 trips will be provided annually, with 40% of these trips provided to <br />new transit riders. An existing PPS vehicle will be used for this program, limiting <br />expenses. <br />Pre and post customer satisfaction surveys will be solicited to assess program <br />success and needed improvements. A financial analysis will help determine <br />program efficiency. Mid-year, staff will evaluate the pilot program to determine <br />whether to continue the project. <br />