Laserfiche WebLink
density higher than 1 unit per acre; reduce the height of dirt taken from the road construction and <br />placed under homes constructed; install a sound barrier along bypass road; convince AI Spotorno to <br />give up property for green space/trails/open space; connect the horse trail from Alisal. <br />CONCLUSION <br />A majority of the HV BRC (8 of the 11 members present) recommended that the City C ouncil <br />consider the bypass road alignment inchided in the Greenbriar 1 [omes' current proposal and that any <br />development approved for Lot 98 include consideration of the following design conditions: <br />1. Designate the maximum height for homes at ,0 feet. <br />2. Monitor traffic nn the bypass road after construction for possible installation of traffic <br />calming methods <br />:. Include a 4 toot crushed granite pathway along bypass road for use by pedestrians and others <br />4. Plant trees along the bypass road where houses abut but have no trees along rest of the <br />roadway <br />5. Minimize lighting on road and use safety lighting only where possible <br />6. [nstall ~ foot berm along western edge of bypass road to minimize visual impact of cars <br />No recommendation was made related to housing density. The HVBRC's work was completed at its <br />last mccting on November 9, ?006. <br />ATTACHMENTS <br />^ Attachment 1: Agenda and minutes from .Tune 8 meeting without attachments <br />^ Attachment 2: Agenda and minutes from July 13 meeting without attachments <br />^ Attachment 3: Agenda and minutes from August 10 mccting without attachments <br />^ Attachment 4: Agenda and minutes from September 14 meeting without attachments <br />^ Attachment 5: Agenda and minutes from September 28 meeting without attachments <br />^ Attachment 6: Agenda and minutes from November 9 mccting without attachments <br />^ Attachment 7: Greenbriar Homes' Proposal for Development of Lot 98 <br />^ Attachment K: Map of seven bypass road alignments previously considered <br />^ Attachment 9: Matrix of alignment options and design elements completed at the September 1 ~4 <br />mccting <br />^ Attachment l0: F,mail from HVBRC member Koper Manning who was absent from the <br />November meeting <br />Happy Valley Blue Ribbon Committee Page 7 <br />February 6, 2007 <br />