My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
041707
>
REGULAR MEETING
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2007 11:02:38 AM
Creation date
4/12/2007 12:10:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/17/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Robin Giffin <br />May 24, 2006 <br />Page 2 of 3 <br />^ Hydrology - We have compiled all background hydrologic information. Need hydraulic <br />information from applicant's engineers, and City staff input on plans for grading to place <br />drainage facilities underground. <br />^ Traffic - Need Dowling's traffic study to complete this section. The traffic study must <br />include changes in daily traffic volumes on local residential streets as a result of project- <br />related changes to local street connections/ extensions. <br />^ Public Services -Need to update information compiled at start of environmental review <br />process. <br />^ Alternatives -Need site plans for the following alternatives and need to resolve <br />discrepancy in assumptions: <br />- A - We have site plan showing connection to Sunset Creek Lane and Middleton. We <br />assumed closure of Middleton Place at Hopkins (requiring Livingston & Braxton <br />residents to use project roads for access). <br />- Al - We have site plan showing access to Sunset Creek Lane, Sycamore Creek <br />Way and Middleton. Dowling analyzes this scenario but assumes EVA connection <br />only to Middleton. <br />- B - We have site plan showing access to Sunset Creek Lane and Sycamore Creek <br />Way and we assumed closure of Middleton Place at Hopkins (requiring Livingston & <br />Braxton residents to use project roads for access). Dowling analyzes these <br />connections but assumes EVA connection to Middleton. <br />- C1 - We have site plan showing access to Sunset Creek Lane and Sycamore Creek <br />Way and we assumed closure of Middleton Place at Hopkins (requiring Livingston & <br />Braxton residents to use project roads for access). However, Dowling assumes <br />connection of project to Middleton and no closure. <br />- C2 -Dowling analyzed this alternative but we don't have a site plan. <br />- D1 -Dowling analyzed this alternative but we don't have a site plan. <br />- D2 -Dowling analyzed this alternative but we don't have a site plan. <br />^ CEQA Considerations (including Cumulative Impacts -awaiting Mundie's report) <br />- Need the following from the City: <br />o List of approved, proposed, and anticipated projects in the City for use in the <br />cumulative analysis. <br />5. Since over a year has passed after completion of the sections listed above under #3, these <br />sections will need to be reviewed and updated as follows: <br />^ Project Description -Need the following from the applicant: <br />- Locations of trails and firebreak (indicate on site plan) <br />- Elevations <br />- Landscape Plan <br />- Construction Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.