My WebLink
|
Help
|
About
|
Sign Out
RES 90130
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1990
>
RES 90130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2012 1:19:28 PM
Creation date
8/12/1999 7:34:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/10/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. WATER FLTND <br /> <br />Water charges in 1990-9! are estimated tc generate approximately <br />$4,715,000 in revenue with proposed expenditures projected to be <br />$4,493,661, plus $650,000 towards debt service payments for the <br />Sycamore Reservoir. A rate study is currently being finalized <br />which will be recom/~ending water rates be adjusted to ensure that <br />water revenues will meet expenditure requirements. For the first <br />time it will also be recommended that the City begin to set aside <br />reserves for capital replacement. This will also be reflected in <br />the rates. The specific rates required to meet the full costs of <br />the operation have not yet been determined. It is also being <br />recommended (subject to the full rate review) that one Water System <br />Operator and one-third of an engineering Technician for computer <br />related projects (to be shared with Sewer and Engineering) be added <br />to the water operation. <br /> <br />V. REVISION TO CAPITAL IMPROVEMENT BUDGET <br /> <br />The Counclt approved the 1990-91 Capital Improvement Budget (CIP) <br />on April 3, 1990. We are recommending with the adoption of the <br />budget that the CIP be amended as follows: <br /> <br />$100,000 be appropriated for the seismic upgrading of <br />Fire Station #1 <br />$25,000 be appropriated for a modification to the <br />Administrative building to provide additional office <br />space for the City Attorney. <br /> <br />With the consideration of the Capital Improvement Budget, in April <br />it was suggested that two other issues would need to be addressed <br />by the Council for potential amendment. The two issues were the <br />water system improvements to the Downtown and the need for a new <br />City Hall. It was indicated at the time of the CIP that the <br />Downtown wa=er improvements would be addressed after the water rate <br />study was completed. As soon as the study is completed it will be <br />forwarded to the Council. <br /> <br />The need for additional office space is needed throughout the Civic <br />Center. 'While there is a critical need this is an issue which will <br />require more thorough review. A preliminary recommendation will be <br />forwarded to the City Council on an approach to this issue during <br />the 1990-91 fiscal year. Given the fact the= any plan will require <br />several years to implement, it is recommended that additional <br />changes be made to the civic center complex at this time to meet <br />the needs of the City Attorney. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.