My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
18 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 1:50:29 PM
Creation date
3/16/2007 2:59:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART Ty~~O - (anticipated construction in 2010-2013) <br />• Multipurpose Meeting Room Addition: single story approximately 3,108 square feet <br />attached to the south of the existing building. <br />• Planned Usage: The Church will utilize the meeting rooms for Christian education and <br />other meetings of the congregation. Outside conununity groups, such as Boy Scouts, 12- <br />step programs and other community groups, may be granted access for meetings. <br />• Site Improvements: Site Development area Part II: 11,500 square feet; Includes: new, <br />relocated and/or extended utility infrastructure for sewer, water, fire water lines, gas <br />service and electrical power; landscaping around new improvement areas; new concrete <br />walkway areas connecting to existing walks and parking areas. <br />• Fire Access: Fire access is provided to all buildings from the north parking lot via access <br />from Golden Road and Hopyard Road <br />• Exterior Lighting: exterior lighting will be installed enhance the proposed building and <br />site appeazance from the street and will be directed downwazd away from adjacent <br />properties. The new building will have perimeter downlights in the building soffits to <br />accent the building articulation. Per discussion w/Jenny Soo, as a condition of approval, <br />lighting details and a photometric site plan will be presented to the planning department <br />for approval prior to issuance of a building permit. <br />Construction Staging: Construction staging, project trailer and materials storage aeeas <br />will be located to the open area east of the addition, and just west of the existing parking <br />Int. Staging areas will remain fenced, and pedestrian traffic to the Church and Preschool <br />will be directed around the construction site. Driveway access to Golden Road will <br />remain open at al] times. <br />Page _i <br />
The URL can be used to link to this page
Your browser does not support the video tag.