Laserfiche WebLink
-l9. Strn~m drainage swales. gutters. inlets. uutfalls, and channels nut ~~°ithin the urea of a <br />dedirurd public street or public service riscnunt approved b~ the City f~:n~ainecr shall he <br />privately nrrintaiued by the property owner(s). <br />;(l. Prior to building permit issuance. the dc~~eloper shall submit a copy of the site, gradiu~~. <br />anti ~iraina~~c plans to 7.one 7 f~~r rep ic~~ oi'the project's consistency kith "Lune 7 <br />applirihle ~~uidclines for projects nc~t to "Lone 7 channels. The de~~eloper shall <br />inrurporate any requested changes into the design of the project suhjrct to the review <br />and approval of the Planning Director. <br />1. The desi~~n of the ~~-titer supply and sanitary sewer systems shall be subject to tt~c rc~~ic~~ <br />and approval ofthc City [engineer. <br />~~. ;~ppro~-al of the storm drainage system shall be subject to the re~~icw and approval oCthe <br />City ~nginccr to determine that the system is adequate, connects to an approved point of <br />discharge. and meets the immediate and long-rui~ec rer~uirements of this development. <br />;. ;Any damage to existing street improvements during construction o^ the subject property <br />shall he repaired to the satisfaction of the City l~:ngincer at full expense to the project <br />developer. This shall include slurry seal, overlay, ur street rcconsh~uctiun if deemed <br />warrantctl by the City ~nginccr. <br />~~1. The project developer's contractor(s) shall obtain an eneroachmcnt permit from the City. <br />l~ngineer prior to moving any cunsh~uction equipment unto the site. <br />5 i. l~he project developer shall pre-treat storm water prior to reaching the storm drains to the <br />satisfaction of the Cily Engineer. The design, Locations, and a schedule for maintaining <br />the liltering system shall he submiucd to the City 1?nginecr for review aad approval prior <br />to issuance of building pcnnits. <br />~(~. ~Chc pro{ect developer shall sweep or vacuum the parking lot and sidc~~alla a minimum <br />of once a month and shall prevent the accumulation of litter and debris on the site. <br />Corners and h~u~d to reach areas shall be s~eept manually. If side~ti~alla and%or the parking <br />lot arc pressure ~~ashed. debris must be trapped and collected to prevent entry into the <br />storm drain system. No clcmiing agent may be discharged into the storm drain. If any <br />cleaning a~~cnt or de~areaser is used. ~~ash ~~~ater must be collected and discharged to the <br />sanitary sewer. subject to approval of the Dublin-San iZamo^ Services District lDS[ZSD). <br />57. ~fhr project dc~eluper shall label all un-site storm drain inlets ~~~ith the wording. "Nu <br />Dumping -- Drains to [3ay" using City-appro~ cd methods and materials. O^-site storm <br />drain Cacilities shall be cleaned a minimum oft~a-ice a year as fbllu~ys: immcdiatel~~ prior <br />M October 1 ti and once in Januan . Additional cleaning may he inquired i f found <br />ncccssv~v by the City Engineer/Chief Building Oflicial. <br />7 <br />