Laserfiche WebLink
Pimlico Drive Ttrrnorrt m:d Pipeline Project Etn~irorur:enttrl Checklist <br />Project Measure NOISE-1: Construction Noise <br />1. The Construction Contractor shall be responsible for complying with the <br />equipment noise limits in the City of Pleasanton's noise ordinance. <br />2. "I'hc Construction Contractor shall be responsible to maintain construction <br />equipment in proper condition to prevent excessive noise. <br />3. The City shall notify residents and businesses at least 24 hours prior to the start of <br />construction of the anticipated schedule of construction activities in the project <br />area including start and end dates of construction. <br />Project Measure TRANS-l: Traffic Control Plan <br />"I'he Construction Contractor shall prepare and implement a Traffic Control Plan upon <br />approval of the City of Pleasanton to minimize potential hazards associated with <br />construction activities at the intersection of Santa Rita Road and Pimlico Drive and other <br />public-rights-of--way in the project area, to allow emergency vehicles to pass at all times <br />or provide alternate routes, and provide reasonable traffic flow and on-street parking in <br />residential and commercial areas. The traffic control plan shall consider the private day <br />care center on Brockton Drive and residences and commercial businesses on Pimlico <br />Drive and Interstate Highway 580 interchange with Santa Rita Road. <br />Surrounding Land Uses and Setting <br />The turn out at the 'Lone 7 water transmission line and the fluoridation facility are bounded on <br />the east and south by residential development and on the north and west by a sound wall and <br />Interstate Highway 580 and Pimlico Drive (see Figure 2). <br />The water transmission pipeline is located within the roadways of Pimlico and Brockton drives. <br />The water transmission pipeline follows Pimlico Drive and ends at the connection with an <br />existing transmission pipeline in Pimlico Road near the intersection with Santa Rita Road. A <br />short section of Pimlico Drive changes to Brockton Drive before becoming Pimlico Drive again. <br />Pimlico Drive and Brockton Drive are bounded by residential development on the south and east <br />and a sound wall and Interstate Highway 580 on the north (see Figure 2). 1'he section of pipeline <br />in Pimlico Drive from Brockton Drive to the connection near Santa Rita Road is bounded on the <br />south and north by commercial businesses and to the west by Santa Rita Road (see Figure 2). <br />The Santa Rita control valve vault at Santa Rita Road is bounded by a commercial area to the <br />north and west and Santa Rita Road on the south and east. The control valve vault will be <br />located within a dedicated public utility easement. <br />City of Pleasanton 12 WinrJer & Kelly <br />Draft Inmal Study/Proposed Negative Declaration August 2006 <br />04263501 <br />